论文部分内容阅读
当前,随着社会经济的快速发展,交通行业有了很好的发展,道路工程建设数量也在不断增多,工程量也在逐渐增多,并且建设周期也在有效延长,因此,在这种状况下进行施工建设,就需要不断的投入大量的人力以及物力。为了能够确保对钻孔灌注桩技术要点进行保证,就需要严格按照相应的施工流程来操作,以此确保施工的顺利进行。
At present, with the rapid socio-economic development, the transportation industry has enjoyed a good development. The number of road construction projects is also on the increase. The construction volume is also gradually increasing and the construction period is also effectively lengthened. Therefore, in this situation To carry out construction, we need to constantly invest a lot of manpower and material resources. In order to ensure that the technical points of bored pile guarantee, we need to strictly follow the appropriate construction process to operate in order to ensure the smooth construction.