六一幼儿院原计划可容600名幼兒,并且还考虑收容婴儿,全部全托。在1951年第一期先建了容200名幼兒的儿童楼,及锅爐房、水塔、大门、车房。后来考虑规模过大,集中儿童太多,不太适宜,并且参考国外幼儿园,很少超过200名者,因此在1953年建筑时,只增加可容100名的儿童楼一座。并继绩兴建办公楼、衞生室、洗衣房、花房、水池、砂池等。另外还建工作人员的宿舍、食堂、托儿所等,而形成现在的总平面。 总平面布置:南面为儿童楼花圃,东北为供应部分,北面为宿舍,共计
The Children’s First Nursery School originally planned to accommodate 600 children, and also considered assuring babies. In the first period of 1951, a children’s building containing 200 children was built, as well as a boiler room, a water tower, a gate, and a garage. Later, considering the scale is too large, there are too many children to concentrate, it is not appropriate, and with reference to foreign kindergartens, there are rarely more than 200 people, so when building in 1953, only one children’s building with a capacity of 100 can be added. It will continue to build office buildings, health clinics, laundry rooms, flower houses, pools, and sand pits. In addition, staff quarters, canteens, nurseries, etc. are also built to form the current general plane. General layout: The south is the children’s flower garden, the northeast is the supply section, and the north is the dormitory.