Microstructure of flow pattern defects in boron-doped Czochralski-grown silicon

来源 :稀有金属(英文版) | 被引量 : 0次 | 上传用户:sunliu168
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
The morphology and microstructure of flow pattern defects (FPDs) in lightly boron-doped Czochralski-grown silicon (Cz-Si) crystals were investigated using optical microscopy and atomic force microscopy. The experimental results showed that the morphology of FPDs was parabola-like with several steps. Single-type and dual-type voids were found on the tip of FPDs and two heaves exist on the left and right sides of the void. All the results have proved that FPDs were void-type defects. These results are very useful to investigate FPDs in Cz-Si wafers further and explain the annihilation of FPDs during high-temperature annealing.
其他文献
水资源不仅仅在人类生存发展中作为一个十分重要的,不可缺少的最基本的自然资源,而且是对农业发展来讲也是一个不可取代的短缺资源之一,本文探讨了农业结构对水资源利用现状,特点
针对多阶段任务系统的可靠性分析,提出系统分解方法.在不完全覆盖条件下,综合两种方法:静态的IGPMS-CPR算法和动态的覆盖模型结合马尔科夫链的一体化方法,侧重研究静态子系统
本文通过分析供应链,供应链的协同是供应链成功必要条件,只有协同式对供应链进行管理,供应链效率才能提高,现行有一种比较流行的供应链技术,CPFR技术,能够高度协助供应链的协
Ni/ (10NiO-NiFe2O4 ) cermets were fabricated by using cold pressing-sintering method. The phase composition and effect of metallic content on the mechanical pro
A key problem of electronic commerce (for short e-commerce) is fair exchange which guarantees that at the end of the transaction, either both parties involved i
Based on experimental data, the energy storage performances of floor radiant heating system were investigated.Based on experimental data, the energy storage per
To study the diagnostic problem of Wire-OR (W-O) interconnect fault of PCB (Printed Circuit Board), five modified boundary scan adaptive algorithms for intercon
The high-temperature, high-pressure hot isostatic pressing technology was used for depositing hard coatings on Ti(C, N)-based cermets. The microstructure and pr
Assuming that road slope and landslide object are rigid, the landslides moving displacement was drawn based on their geometry shapes and the physi-mechanical fe
阔滩水电站由浆砌石双曲拱坝、发电引水隧洞及装机2×3200kW的主、副厂房及变电站等组成。拦河坝为浆砌石双曲拱坝,最大坝高59.1m;发电引水系统包括进水口、平洞段、调压井及