论文部分内容阅读
本文主要论述我单位施工的注水站工程中100m3及50 m3钢制储罐在施工现场以外整体预制、拉运以及整体吊装到储罐基础上的施工技术。
This paper mainly discusses the construction techniques of 100 m3 and 50 m3 steel storage tanks outside the construction site in the project of water filling station construction of our unit, prefabricated and transported as a whole and hoisted to the foundation of the storage tank.