论文部分内容阅读
中央领导同志,非常关怀我国电力事业的发展,指示我们电力要先行,要加速开发水电。汉江上游干流水力资源丰富,总装机容量218~275万瓩,年发电量76.4亿度。地理位置在电力布局上十分重要,它可满足本地区工农业发展用电的需要,也可将大量的电力外送。建议加速开发汉江上游干流水电建设步伐,为四化作贡献。
The central leading comrades care very much about the development of China’s power industry and instruct us that electricity should be prioritized and that hydropower development should be accelerated. The upper reaches of the Hanjiang River have abundant water resources with a total installed capacity of 218-275 million tons and an annual generating capacity of 7.64 billion kilowatt-hours. Geographical location in the layout of the power is very important, it can meet the industrial and agricultural development in the region need for electricity, but also can be a large amount of electricity to send. It is proposed to accelerate the pace of hydropower construction in the upper reaches of the Han River and contribute to the four modernizations.