故事发生在2009年深秋的一天,地点是矿区选煤楼。当时我作为煤矿选运科的机电技术员,被新来的科长委以重任,担任选煤楼配电盘系统改造的总负责人。我趁着矿井系统改造停产的两个月间隙,抓紧时间进行电气线路的系统改造。目标是将原来的集中控制线路改为分段控制,从而精简人员,提高效率。当时为了赶工期,白班的时候我和大家一起干,等到晚上五点工人们都下班回家了,我还一个人留在选煤楼上干些细活抢进度。我经常是干到
The story takes place in the late autumn day in 2009, the site is coal mining coal. At that time, as a mechanical and electrical technician in the Coal Transportation Section, I was entrusted with the responsibility by the newly appointed chief of staff and served as the chief person in charge of the transformation of the switchboard system of the coal preparation plant. I took advantage of the shutdown of the mine system transformation of the two-month gap, seize the time for the electrical system transformation. The goal is to change the original centralized control line to piecewise control so as to streamline personnel and improve efficiency. At that time in order to catch the time, I work with everyone when the day shift, until five o’clock in the evening the workers came home from work, and I still stay alone in the coal preparation plant to do some fine detail. I often do it