为了解决穿层钻孔预抽煤层瓦斯时抽采浓度低、抽采效果差,造成煤层消突不彻底这一难题,在设计钻孔时在常规穿层钻孔预抽瓦斯技术的基础上采用掏穴扩孔工艺。通过对煤层段进行扩孔增加对周围煤体的扰动,增大钻孔周围煤体的膨胀变形程度,使得煤层卸压更加充分,煤层的透气性增强,钻孔预抽瓦斯的消突效果提高,煤与瓦斯突出的可能性降低。
In order to solve the problem of low extraction concentration, poor pumping efficiency and incomplete elimination of coal seam during the drilling of pre-pumping coal seam through the borehole, the conventional pre-pumping drilling gas drainage technology was adopted in the design of the borehole Dig hole reaming process. By expanding the coal seam section to increase the perturbation to the surrounding coal body and increasing the expansion and deformation of the coal body around the borehole, the pressure relief of the coal seam is more sufficient, the permeability of the coal seam is enhanced, and the eliminating effect of the pre-drainage drilling is improved , The possibility of coal and gas outburst is reduced.