论文部分内容阅读
中亚中部天然气管道系统将从土库曼斯坦开始,经乌兹别克斯坦和哈萨克斯坦领土,最后到达俄罗斯。这条输气管道已准备好把土库曼斯坦石油运往俄罗斯,输送能力为120万一130万立方米/日。中亚中部天然气管道将把土天然气输往俄罗斯@刘凤霞
Central Asia Central Gas Pipeline System will start from Turkmenistan, through the territory of Uzbekistan and Kazakhstan, and finally to Russia. The gas pipeline is ready to transport Turkmenistan’s oil to Russia with a capacity of 1.2-1.3 million cubic meters per day. Central Central Gas Pipeline will send natural gas to Russia @ Liu Fengxia