平煤股份十一矿丁六采区皮带下山位于断层带附近,围岩松软,构造应力大,并受到巷道群交叉相互影响,巷道变形严重,虽经过多次维修,仍无法保证该皮带下山的正常使用。该项目采用巷道二次支护技术,通过对支护理念的分析,确定二次支护时间,并采用新型马蹄形刚性支架。经过矿压观测表明,修复后的皮带下山巷道变形量较小,能满足生产需求。
Pingdingshan 11th Ding Dao 6th District belts down the mountain near the fault zone, surrounding rock soft, tectonic stress, and by cross-lane group interaction, serious deformation of the roadway, though after several repairs, still can not guarantee the belt down Normal use. The project uses roadway secondary support technology, through the analysis of support concept to determine the secondary support time, and the use of a new type of horseshoe-shaped rigid bracket. After the rock pressure observation shows that the repair of the belt down the roadway deformation is small, to meet the production needs.