吐孜乌达克支渠现状为土渠,主要存在如渗漏严重,渠系水利用系数低;断面不规则,输水效率低下,过流能力不足;渠系建筑物未配套致使项目区生态林不能有效灌溉等突出问题。其渠道断面型式的设计必须根据地质勘测成果、工程的实际运行与管理的需要进行选取,经过比选,综合考虑施工运行管理、建筑工程费以及建筑材料等因素,结构形式选用全断面现浇混凝土板方案,抗冻胀选择苯板防冻胀方案。
The current situation of Tuzik branch in Tokuji is a canal, with the main problems being serious seepage, low drainage coefficient of canal system, irregular cross section, inefficient water conveyance and lack of overcurrent capacity; Not effective irrigation and other prominent issues. The design of the cross-section of its channel must be based on the geological survey results, the actual operation and management of the project to select, after a comparison, considering the construction operation management, construction costs and construction materials and other factors, the choice of structural forms of full-face cast-in-place concrete Plan board, anti-frostbite choose benzene board frost heaving program.