东辛一矿采油十七队目前主要开发辛47区块和营72区块两大区块,开井数为78口,其中能够安装远传功图仪器的抽油机共计65口,占总井数的83%,占全队产量63%。随着2013年5月远传功图软件逐渐开始试运行与正式运用,对我们采油队的生产管理及实际运行提出了更加严格、更加细致的要求,并且由于本队抽油机井特殊井数较多,占全队总井数的65%、占产46%,这就更加需要合理运行远传功图软件和加强日常维护管理等多方面的细致化工作,为保证全队正常生产运行提供有力的技术支持。
At present, the 17th unit of the oil production team of East Xindi Mine mainly develops two blocks of Xin 47 block and Ying 72 block with 78 open wells, of which a total of 65 pumping units capable of installing far-reaching power diagram instruments account for a total of 83% of the wells, accounting for 63% of the team production. With the gradual commencement of trial operation and formal application of far-reaching power map software in May 2013, we have put forward stricter and more detailed requirements on the production management and actual operation of our production crews. In addition, Which accounted for 65% of the total number of wells in the team and accounted for 46% of the total. This further requires the careful operation of far-distance power mapping software and routine maintenance and management work, which is more effective in ensuring the normal production and operation of the team Technical support.