【摘要】在经济快速发展的今天,我国的建筑行业正在发生着翻天覆地的变化,由于人们对建筑工程的质量提出了较高的要求,所以在建筑工程中高大模板的施工技术是十分重要的。本研究结合实际情况进行了详细分析,阐述了高大模板的概念以及其在建筑施工中的应用,希望能为今后建筑工程中高大模板施工的技術提出有意义的价值和参考意见。
【关键词】建筑工程;高大模板;施工技术
Study on Construction Technology of High Formwork in Construction Engineering
Cui Ting-ting
(Liaoning Zhongyu Construction (Group) Co., LtdFushunLiaoning113000)
【Abstract】In the rapid development of the economy today, China's construction industry is undergoing earth-shaking changes, because people on the quality of construction projects put forward higher requirements, so in the construction of tall template construction technology is very important. This paper analyzes the concept of tall template and its application in construction, and hopes to make meaningful value and reference for the technology of high template construction in future construction engineering.
【Key words】Construction engineering;Tall template;Construction technology
随着建筑行业的不断扩大,土地占有面积已经成为十分严峻的问题,所以在城市中出现了越来越多高层建筑,因此高大模板在建筑工程中得到普遍应用。由于高大模板的施工技术还存在许多不足问题,导致频繁出现建筑倒塌事故,严重的威胁了人们的人身和财产安全。所以对提高高大模板的施工技术是十分必要的,本研究通过对高大模板的施工技术的应用详细的进行了探讨,希望能为提高建筑施工技术和提升工程施工进度做出贡献。
1. 分析高大模板支架的概念
(1)要想对高大模板施工技术的实际应用进行分析,就必须要了解什么是高大模板支架,从字面上就能知道从高架的高度很大,那高度大多少才是一个界限呢,通过专业知识的调查可知,高大模板支架指高度大于8米、支架的横跨宽度大于18米、或是在施工的每平方米的荷载大于10千牛、或着是集中线每米受到的荷载大于15千牛的模板支架。所以高大模板的自身特点就是空间跨度大,可应用在高度要求较高的混凝土建筑中,而且自身的重量也很大。
(2)由于支脚架的类型有许多种,例如:碗扣式、门式以及型钢,它们都具备着各自的优点,所以针对不同的建筑要求来讲,在选择模板支撑的脚手架时要视情况而定,以选取最佳的方案来达到提高建筑的质量的目的。
2. 分析高大模板的施工顺序
(1)每项工作都有自己的顺序流程,建筑工程中的高大模板的技术也不例外,它具有严格的工作顺序,并且要求每一个环节都不能出现错误,一旦出现漏洞,将会带来经济上的巨大损失,所以要十分注意高大模板的施工顺序。
(2)在建设初期要先明确指出轴线以及梁的位置,并要标记出来,定好水平的标高位置,在指定的地点安装好梁和板脚手架,然后安装梁底模板和侧模板,接着架设板底木枋于脚手架横杆上,在上面进行楼板模板的固定,浇灌符合标准等级的混凝土,经过一定的时间后,将手脚架,梁,模板都进行拆卸,最后使模板经清洗处理。
3. 分析建筑工程中高大模板施工技术
3.1混凝土墙板的施工技术。
(1)混凝土墙板,用是建设房屋和各种工程结构中的基本结构或构件。混凝土墙体是利用多层复合板进行的施工。首先计算建筑的墙体尺寸,再根据多个板面完成拼接,最终形成整块的大模板,然后再将其组装成墙的模型。
(2)在混凝土墙板的施工的过程中,要记得在模板的上方按照预定的位置钻出对拉螺栓孔,同时要将开好圆孔涂上油漆封上,切记不要沾到板面上,造成墙面得到污染,为下面的框架安装做铺垫。外墙的大面积的模板由于尺寸比较大,所以必须依靠符合模数的单元拼墙体模板拼接合成,并且要不保证相互之间得到牢固的啮合。混凝土墙板的底部固定方式与柱大模板底部固定方式是一致,都是需要钢管进行加固,而对于没有留好的部位可采用插木楔调整。只有在脚手架搭设完毕后才可以将已加工好的多层板面的拼接墙模板按照规定制模。最后将模板移至指定地方,将模板固定在事先已经绑扎好的钢筋网片上,完成混凝土墙板的建立。
3.2框架柱施工技术。
(1)只有建立准确无误的框架基础,才能为后面的模板放置奠定良好的基础,所以要仔细核实框架柱的施工。先将对拉螺栓穿过即将要安装的另外一面模板上,等到模板到达指定地方后,再将螺栓进行旋转加紧,使两侧的架子与之前的固定好的模板的位置上形成一个整体,然后再进行轴线位置及垂直度的校核工作。预先在浇灌混凝土的地方留好一定大小的钢筋头,可以借助钢筋头的位置再对不合适的地方进行改正。
(2)除此之,要注意在设立柱模板时,要记得在柱模板周围建立安全的防护栏,可以避免出现在柱模板吊装、拆除、清理过程中发生人员受伤事件的发生。 3.3顶板模板施工技术。
(1)对于高大模板施工的技术来讲,顶板模板施工也扮演着很重要的角色。平台模板主要以钢管脚手架为主,在支顶板时要先搭好规定尺寸的脚手架,這样才能确保顶板模板的建立。顶板包括主龙骨和次龙骨,将主龙骨垂直于木方放置,次龙骨采用竖向在木方上,同时次龙骨上面要多铺几层木板,用钉子使它们接合在一起,在其中用胶带贴紧海绵条,达到防止漏浆的目的。
(2)当平顶的模板与已浇筑墙柱接触时,在两者交汇处粘贴海绵条,再加上次龙骨使之顶紧,以防止漏浆,污染墙、柱面的现象,延长模板的使用周期。
3.4浅析拆除模板技术。
(1)模板的拆除时一项很重要的工作环节,它的成功决定着最后的建筑是否能够开展后续的工作。首先由于专业的技术人员根据实地调查,分析混凝土的强度是否达到指定要求,再决定是否符合拆除,如果满足要求才可以进行拆除工作。在拆除过程中,要保障墙体的表面和墙角都不能受到破损,并且要按照规定的顺序一步步拆除,要切记拆除的顺序恰好与安装模板顺序相反,也就是说先支起的模板要进行最后的拆卸,后支的模板要首先拆除。在拆除楼板的过程时要时刻注意先调节顶部的支撑头,让支撑物逐渐向下移,达到符合模板与楼板分离高度时,停止调动方可拆除,同时保留拆除板模板的养护支撑。
(2)拆卸完成后的模板通过吊起放至到指定的地点,并要求模板平放。之后在进行清理工作,检查是否有损伤,一旦发现要及时进行修理,以方便后续的再次使用。
4. 施工技术时的注意事项
建筑工是一个要求十分严格的工作,所以在工作过程中要时刻遵守技术要求,本研究由实际调查得出几个在施工时常出现的问题,作为施工时的警醒。
4.1建立施工方案。
预先要求制作出混凝土浇筑的方案,再通过专业人员的审核,之后才可以保证模板支架施工过程中均衡受载,而选择浇灌的方式也很重要,最好采用由中部向两边扩展的浇筑方式。
4.2准确计算施工技术所承担的荷载。
承受荷载的能力决定着模板的使用寿命,所以严格控制实际施工荷载不超过设计荷载,尽量避免在支架上方放有钢筋等材料,减少支架的负重。如果出现超过最大荷载的现状,要采取相应的改进方法。
4.3混凝土的两次浇筑。
由于框架的梁很高大,为了提高支撑架的安全性和可靠性,框架梁的混凝土要分成两次浇筑。第一次浇筑要注意深度,第二次浇筑要和楼板一起浇筑,这样可以确保支撑架充分发挥它的作用。
4.4加强监督管理制度。
在施工过程中,要专门安排人员进行不定期的抽查,检查支架和支承的情况,及时发现潜在的问题,并将面临的问题解决处理,防止影响以后的工作发展。
5. 结语
建筑质量的高低决定着建筑行业是否能稳步发展,而决定质量的根本在于建筑施工过程中的应用技术。对于高大模板工程来说,要认真在施工前做好准备工作,详细地进行各方面的调查和数据计算,并且通过专家们的分析和研究,在施工过程中要确保每项工作都能顺利进行,才能最终获得圆满的胜利,可见建筑工程的高大模板技术是十分复杂的。以上就是本研究根据实际现状的调查得出相应的技术方面的知识,希望能给建筑行业带来有利的参考价值。
参考文献
[1]周启文.关于高大模板支撑工程施工技术探讨[J].城市建设,2010(21).
[2]张克迎,李恩来,刘江.高大模板支撑工程施工技术[J].科技传播,2011(19).
[3]周继忠,蔡雪峰,张士元.扣件钢管脚手架高大模板支撑安全事故分析与控制[J].福建工程学院学报,2008,6(1).
[文章编号]1619-2737(2017)05-06-503
【关键词】建筑工程;高大模板;施工技术
Study on Construction Technology of High Formwork in Construction Engineering
Cui Ting-ting
(Liaoning Zhongyu Construction (Group) Co., LtdFushunLiaoning113000)
【Abstract】In the rapid development of the economy today, China's construction industry is undergoing earth-shaking changes, because people on the quality of construction projects put forward higher requirements, so in the construction of tall template construction technology is very important. This paper analyzes the concept of tall template and its application in construction, and hopes to make meaningful value and reference for the technology of high template construction in future construction engineering.
【Key words】Construction engineering;Tall template;Construction technology
随着建筑行业的不断扩大,土地占有面积已经成为十分严峻的问题,所以在城市中出现了越来越多高层建筑,因此高大模板在建筑工程中得到普遍应用。由于高大模板的施工技术还存在许多不足问题,导致频繁出现建筑倒塌事故,严重的威胁了人们的人身和财产安全。所以对提高高大模板的施工技术是十分必要的,本研究通过对高大模板的施工技术的应用详细的进行了探讨,希望能为提高建筑施工技术和提升工程施工进度做出贡献。
1. 分析高大模板支架的概念
(1)要想对高大模板施工技术的实际应用进行分析,就必须要了解什么是高大模板支架,从字面上就能知道从高架的高度很大,那高度大多少才是一个界限呢,通过专业知识的调查可知,高大模板支架指高度大于8米、支架的横跨宽度大于18米、或是在施工的每平方米的荷载大于10千牛、或着是集中线每米受到的荷载大于15千牛的模板支架。所以高大模板的自身特点就是空间跨度大,可应用在高度要求较高的混凝土建筑中,而且自身的重量也很大。
(2)由于支脚架的类型有许多种,例如:碗扣式、门式以及型钢,它们都具备着各自的优点,所以针对不同的建筑要求来讲,在选择模板支撑的脚手架时要视情况而定,以选取最佳的方案来达到提高建筑的质量的目的。
2. 分析高大模板的施工顺序
(1)每项工作都有自己的顺序流程,建筑工程中的高大模板的技术也不例外,它具有严格的工作顺序,并且要求每一个环节都不能出现错误,一旦出现漏洞,将会带来经济上的巨大损失,所以要十分注意高大模板的施工顺序。
(2)在建设初期要先明确指出轴线以及梁的位置,并要标记出来,定好水平的标高位置,在指定的地点安装好梁和板脚手架,然后安装梁底模板和侧模板,接着架设板底木枋于脚手架横杆上,在上面进行楼板模板的固定,浇灌符合标准等级的混凝土,经过一定的时间后,将手脚架,梁,模板都进行拆卸,最后使模板经清洗处理。
3. 分析建筑工程中高大模板施工技术
3.1混凝土墙板的施工技术。
(1)混凝土墙板,用是建设房屋和各种工程结构中的基本结构或构件。混凝土墙体是利用多层复合板进行的施工。首先计算建筑的墙体尺寸,再根据多个板面完成拼接,最终形成整块的大模板,然后再将其组装成墙的模型。
(2)在混凝土墙板的施工的过程中,要记得在模板的上方按照预定的位置钻出对拉螺栓孔,同时要将开好圆孔涂上油漆封上,切记不要沾到板面上,造成墙面得到污染,为下面的框架安装做铺垫。外墙的大面积的模板由于尺寸比较大,所以必须依靠符合模数的单元拼墙体模板拼接合成,并且要不保证相互之间得到牢固的啮合。混凝土墙板的底部固定方式与柱大模板底部固定方式是一致,都是需要钢管进行加固,而对于没有留好的部位可采用插木楔调整。只有在脚手架搭设完毕后才可以将已加工好的多层板面的拼接墙模板按照规定制模。最后将模板移至指定地方,将模板固定在事先已经绑扎好的钢筋网片上,完成混凝土墙板的建立。
3.2框架柱施工技术。
(1)只有建立准确无误的框架基础,才能为后面的模板放置奠定良好的基础,所以要仔细核实框架柱的施工。先将对拉螺栓穿过即将要安装的另外一面模板上,等到模板到达指定地方后,再将螺栓进行旋转加紧,使两侧的架子与之前的固定好的模板的位置上形成一个整体,然后再进行轴线位置及垂直度的校核工作。预先在浇灌混凝土的地方留好一定大小的钢筋头,可以借助钢筋头的位置再对不合适的地方进行改正。
(2)除此之,要注意在设立柱模板时,要记得在柱模板周围建立安全的防护栏,可以避免出现在柱模板吊装、拆除、清理过程中发生人员受伤事件的发生。 3.3顶板模板施工技术。
(1)对于高大模板施工的技术来讲,顶板模板施工也扮演着很重要的角色。平台模板主要以钢管脚手架为主,在支顶板时要先搭好规定尺寸的脚手架,這样才能确保顶板模板的建立。顶板包括主龙骨和次龙骨,将主龙骨垂直于木方放置,次龙骨采用竖向在木方上,同时次龙骨上面要多铺几层木板,用钉子使它们接合在一起,在其中用胶带贴紧海绵条,达到防止漏浆的目的。
(2)当平顶的模板与已浇筑墙柱接触时,在两者交汇处粘贴海绵条,再加上次龙骨使之顶紧,以防止漏浆,污染墙、柱面的现象,延长模板的使用周期。
3.4浅析拆除模板技术。
(1)模板的拆除时一项很重要的工作环节,它的成功决定着最后的建筑是否能够开展后续的工作。首先由于专业的技术人员根据实地调查,分析混凝土的强度是否达到指定要求,再决定是否符合拆除,如果满足要求才可以进行拆除工作。在拆除过程中,要保障墙体的表面和墙角都不能受到破损,并且要按照规定的顺序一步步拆除,要切记拆除的顺序恰好与安装模板顺序相反,也就是说先支起的模板要进行最后的拆卸,后支的模板要首先拆除。在拆除楼板的过程时要时刻注意先调节顶部的支撑头,让支撑物逐渐向下移,达到符合模板与楼板分离高度时,停止调动方可拆除,同时保留拆除板模板的养护支撑。
(2)拆卸完成后的模板通过吊起放至到指定的地点,并要求模板平放。之后在进行清理工作,检查是否有损伤,一旦发现要及时进行修理,以方便后续的再次使用。
4. 施工技术时的注意事项
建筑工是一个要求十分严格的工作,所以在工作过程中要时刻遵守技术要求,本研究由实际调查得出几个在施工时常出现的问题,作为施工时的警醒。
4.1建立施工方案。
预先要求制作出混凝土浇筑的方案,再通过专业人员的审核,之后才可以保证模板支架施工过程中均衡受载,而选择浇灌的方式也很重要,最好采用由中部向两边扩展的浇筑方式。
4.2准确计算施工技术所承担的荷载。
承受荷载的能力决定着模板的使用寿命,所以严格控制实际施工荷载不超过设计荷载,尽量避免在支架上方放有钢筋等材料,减少支架的负重。如果出现超过最大荷载的现状,要采取相应的改进方法。
4.3混凝土的两次浇筑。
由于框架的梁很高大,为了提高支撑架的安全性和可靠性,框架梁的混凝土要分成两次浇筑。第一次浇筑要注意深度,第二次浇筑要和楼板一起浇筑,这样可以确保支撑架充分发挥它的作用。
4.4加强监督管理制度。
在施工过程中,要专门安排人员进行不定期的抽查,检查支架和支承的情况,及时发现潜在的问题,并将面临的问题解决处理,防止影响以后的工作发展。
5. 结语
建筑质量的高低决定着建筑行业是否能稳步发展,而决定质量的根本在于建筑施工过程中的应用技术。对于高大模板工程来说,要认真在施工前做好准备工作,详细地进行各方面的调查和数据计算,并且通过专家们的分析和研究,在施工过程中要确保每项工作都能顺利进行,才能最终获得圆满的胜利,可见建筑工程的高大模板技术是十分复杂的。以上就是本研究根据实际现状的调查得出相应的技术方面的知识,希望能给建筑行业带来有利的参考价值。