Analyses of environmental impacts of underground coal mining in an arid region using remote sensing

来源 :煤炭学报(英文版) | 被引量 : 0次 | 上传用户:ty5004
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
The influences of coal mining in an arid environment on vegetation coverage,land-use change,desertification,soil and water loss were discussed.A series of available TM/ETM+ images with no cloud cover from July/August in different years (1990,1995,2000 and 2005)were used to analyze the change in various land environmental factors over time.The results show that while mining activity initially had a marked adverse impact on the environment,mine rehabilitation measures have also subsequently played a great role in improving vegetation cover and controlling land desertification and loss of water and soil.The effect of coal mining on vegetation cover is dependent upon the soil type and natural indigenous flora.Results of this investigation imply that mining activity has a greater effect on the vegetation of loess areas than at sandy sites.Although local vegetation coverage was improved by planting in the mining area,the total area of land affected by desertification still increased from 26.81% in 1990 when large-scale mine construction was introduced,to 46.79% in 1995.With continuous efforts at rehabilitation,the vegetation cover in the Shendong coal mining area was increasing,and loss of water and soil were effectively controlled since 1995.Subsequently,the total area of extreme desertification decreased to 23.24% in 2000 and further to 18.68% in 2005.The total area affected by severe loss of water and soil also decreased since the early 1990’s(70.61% in 1990,71.43% in 1995),to 43.64% in 2000 and 34.93% in 2005,respectively.
其他文献
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
请下载后查看,本文暂不支持在线获取查看简介。 Please download to view, this article does not support online access to view profile.
期刊
请下载后查看,本文暂不支持在线获取查看简介。 Please download to view, this article does not support online access to view profile.
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
期刊
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
两位艺术家之间有着深厚的友谊和专业的学术合作关系。2005-2009年,在北京,他们从无到有一起策划并成功的创建了第一个——中(中国中央美术学院)、英(英国格拉斯哥美术学院)
“江南千条水,云贵万重山。五百年后看,云贵胜江南。”这是明朝开国元勋刘伯温所做的预言。这位能掐会算的军师此话的依据已无从知晓。但贵州多山、江南多水的说法,却自古以
The mechanism of floor heave was analyzed by establishing mechanics models and solving differential equations.The amount of floor heave is proportional to the a
本文考察明清时期武安商人的兴起背景和发展脉络,并采用整体与个案相结合的研究方法,突出武安商人的经营活动,彰显其独特的商业历史。本文对包括选题的意义、学术前史回顾、