Treatment design of geological defects in dam foundation of Jinping I hydropower station

来源 :Journal of Rock Mechanics and Geotechnical Engineering | 被引量 : 0次 | 上传用户:drg45tg54h4h
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
Jinping I hydropower station is one of the most challenging projects in China due to its highest arch dam and complex geological conditions for construction.After geological investigation into the dam foundation,a few large-scale weak discontinuities are observed.The rock masses in the left dam foundation are intensively unloaded,approximately to the depth of 150–300 m.These serious geological defects lead to a geological asymmetry on the left and right banks,and thus some major diffculties of dam construction are encountered.In this paper,the influences of geological defects on the project are analyzed,followed by the concepts and methods of treatment design.Based on the analysis,the treatment methods of the weak rock masses and discontinuities are carefully determined,including the concrete cushion,concrete replacement grids,and consolidation grouting.They work together to enhance the strength and integrity of the dam foundation.Evaluations and calibrations through geo-mechanical model tests in combination with feld monitoring results in early impoundment period show that the arch dam and its foundation are roughly stable,suggesting that the treatment designs are reasonable and effective.The proposed treatment methods and concepts in the context can be helpful for similar complex rock projects. Jinping I hydropower station is one of the most challenging projects in China due to its highest arch dam and complex geological conditions for construction. After geological investigation into the dam foundation, a few large-scale weak discontinuities are observed. The rock masses in the left dam foundation are intensively unloaded, approximately to the depth of 150-300 m.These serious geological defects lead to a geological asymmetry on the left and right banks, and thus some major diffculties of dam construction are encountered. in this paper, the influences of under the concepts and methods of treatment design.Based on the analysis, the treatment methods of the weak rock masses and discontinuities are carefully determined, including the concrete cushion, concrete replacement grids, and consolidation grouting. They work together to enhance the strength and integrity of the dam foundation. Evaluation and calibrations through geo-mechanical m odel tests in combination with feld monitoring results in early archival period show that the arch dam and its foundation are roughly stable, suggesting that the treatment designs are reasonable and effective. proposed proposed treatment methods and concepts in the context can be helpful for similar complex rock projects.
其他文献
上世纪中叶,我国建设了大批土石坝,为农业发展发挥了巨大作用.因受当时条件限制,工程多为"三边工程",水文、地质资料缺乏,部分水库甚至无设计资料.加之施工落后、运行管理差,
本文主要探讨了振动压路机振动压实的非线性特点,利用有限元分析软件ABAQUS建立了振动轮-土体系统的有限元模型,对振动轮的振动压实过程进行了仿真和分析。 In this paper,
根据普安县过去十几年的耕地变化情况,从古地理和地质环境背景、地貌形态、水文地质条件、土壤特性几个方面分析了导致普安县耕地变化的自然因素,并采用主成分分析法,得出了导致普安县耕地变化的人文驱动因子,为喀斯特山区耕地保护提供了依据。
A methodology applicable at any phase of a surface mining project for evaluating its current technical and economic feasibility is presented. It requires the t
The experimental study in this paper focuses on the effects of the layer orientation and sample shape on failure strength and fracture pattern of samples tested
笔者首先对地基工程地基重要性及分类进行了简要的介绍,接着又对地基工程施工技术进行了分析。
本文就结合土地整理测绘概念与数字化测绘技术的特点,详细分析了GPS-RTK技术在土地整理测绘中的应用,为同行共勉。
随着科技的进步和经济的发展,岩土钻掘工程在国民经济中发挥着越来越大的作用。在深基坑工程施工过程中,由于传统钻机的自重有限,不可能给钻头施加更大的进给压力,而旋挖钻机由于
机电一体化是一种复合技术,是机械技术与微电厂技术、信息技术相互结合的产物.机电一体化为大型制造企业带来了革命性的变革.本文分析厂机电体化的发展趋势.并探讨了其在大型
水利工程施工行业竞争日益激烈,加强工程施工成本控制是提升施工企业管理水平的关键.本文探讨了水利工程项目成本管理措施.