一、前言二汽配套处高层立体仓库(以下简称配套处高库)于74年10月开始设计。由于“四人邦”的干扰和其他一些问题,设计工作停顿三年时间。78年再次确定由二汽工厂设计处设计,二汽动力厂负责制造。根据用户(配套处)意见,以及库房已盖好、地坪已做好的实际情况,巷道式堆垛机采用北汽堆垛机结构,某些部件采用北汽堆垛机部件图纸。本文着重介绍巷道式堆垛机的结构、试验情况和一些看法。二、高层仓库内部布置配套处高库的总面积为7000米~2,库房共有三跨,每跨长84米、跨度24米、屋架下弦15米。在不相连的两跨中布置安装14个巷道、28排货架,每排
First, the foreword Two steam supporting high-rise warehouse (hereinafter referred to as supporting high library) in October 74 began to design. Due to the “gang of four” interference and other problems, the design work has been suspended for three years. 78 years once again determined by the two steam factory design office design, two steam power plant is responsible for manufacturing. According to the user (supporting office) comments, as well as the Treasury has been covered, the floor has been done the actual situation, the tunnel type stacker Beiqi stacker structure, some parts using Beiqi stacker parts drawings. This article focuses on the alley-type stacker structure, test conditions and some views. Second, the arrangement of high-level warehouse interior layout of the total area of high library 7000 meters ~ 2, a total of three storerooms, each span 84 meters long, span 24 meters, 15 meters under the roof truss. Installed in the non-connected two spans in 14 roadway, 28 rows of shelves, each row