摘要:近年来,随着我国经济的快速发展,建筑行业和建筑工程技术也取得了较大的进步,混凝土后浇带施工工艺得到了广泛的应用,该工艺能够有效的保证建筑物的结构完整,同时避免不规则沉降的发生。本文结合施工与监理的经验对后浇带的质量控制进行浅要分析,总结了监理对后浇带质量控制要点。
关键词:建筑工程混凝土后浇带监理要点
Abstract: in recent years, with the rapid economic development of our country, the construction industry and building engineering technology has also made great progress, and concrete pouring belt construction craft a wide range of applications, this technology can effectively ensure the complete structure building, at the same time, avoid the happening of irregular settlement. Based on the experience of the construction and supervision of the pouring belt quality control to a shallow analysis, summarizes the supervision of the pouring belt quality control points.
Keywords: building engineering concrete pouring belt supervision points
中图分类号:U415.1 文献标识码:A文章编号:
长期以来,建筑工程中往往要在混凝土施工时留设后浇带,其目的在于对建筑工程结构产生不均匀沉降时,或者由于温度湿度以及其他原因造成混凝土裂缝问题时提供有效的解决措施;同时后浇带施工工艺也多用于一些不便于设置变形缝的建筑工程中。目前我国建筑行业的相关规范中,对于混凝土后浇带施工工艺缺乏明确的规定,因此在实际施工过程中,有着各种各样的混凝土后浇带施工工艺,而有些不完善的做法会对建筑物本身的结构产生严重的影响,因此,对于混凝土后浇带施工工程的监督和检查就显得尤为重要,本文就对混凝土后浇带施工的监理工作要点进行初步的分析,希望以此为监理工程师提供参考。
一、混凝土后浇带的设计要求
1.后浇带位置的选择
混凝土施工过程中,对后浇带的位置选择十分重要,如果不能留设准确的后浇带,则不仅无法发挥其作用,反而会对建筑物自身的结构产生影响。我国现行地下工程防水技术规范中规定:“后浇带应设在受力和变形较小的部位,间距宜为30m~60m”。而在实际的工程施工中,后浇带的位置应当由设计者根据工程的类型、结构以及地质条件等具体情况进行计算来确定,现行的工程设计规范中,设计者往往将后浇带的位置选择在梁、板跨的1∕3处,也有个别工程设计中没有对具体尺寸进行标注而只简单的标出了后浇带大致的位置。
2.后浇带宽度的确定
后浇带宽度的确定往往需要与板、墙的厚度相适应。现行GB50108-2001规定“后浇带的宽度宜为700mm-1000mm”。在实际的工程中,后浇带的宽度应当由设计者根据工程的现场情况以及工程的地理位置来决定,在确定后浇带的宽度时,应当遵循宜窄不宜宽的原则,通常情况下,设计者都将后浇带的宽度设计为800mm。
3.后浇带形式的选择
后浇带的形式指的就是后浇带两侧混凝土接缝处的断面形式,常用的后浇带形式一般有平直缝、企口缝、阶梯缝、V形缝等四种形式。在实际工程中,应当根据工程的实际情况,以及后浇带的位置、宽度等综合因素确定所需要的后浇带形式,并且需要绘制详细的施工图纸。
4.后浇带的钢筋处理
关于后浇带处的钢筋是否需要断开,应当由设计者根据后浇带的形式以及设置后浇带的目的而来决定。后浇带处的钢筋贯通会对其两侧的混凝土产生制约,当钢筋产生拉应力时,则会造成后浇带处混凝土发生裂缝;后浇带处的钢筋如果断开,则能够使应力得到有效的释放。通常情况下,沉降用后浇带的钢筋一般选择贯通。而伸缩后浇带的钢筋则应该断开;梁板结构中,板筋需要断开,而梁筋需要贯通。当钢筋断开后需要进行连接时,可以采用搭接和焊接的方式,搭接的钢筋数应当小于25%,焊接的钢筋应当锚在同一个位置,不能离开断开位置的一半以上。
5.后浇带的防水措施
在实际工程中,后浇带应该具有一定的防水措施,尤其是后浇带接缝处的防水工作,能够有效的防止渗漏的发生。一般情况下所采用的防水措施,是将止水条预埋在后浇带的接缝处或者将止水带贴在后浇带的接缝处。当后浇带施工需要提前止水时,可以将后浇带部位混凝土的局部进行加厚同时增设止水带。要严格按照施工图纸和GB50108-2001地下工程防水技术规范要求施工,保证防水构造措施施工质量。
二、混凝土后浇带施工过程的质量控制
1.模板以及其支撑系统的质量控制
经过笔者多年的实践经验中得出,后浇带的模板支撑系统是最容易发生质量问题的环节,其常见的质量问题表现在不设置独立的支撑、拆模体系。由于缺乏独立的支撑系统,则使得后浇带处的模板必须要连同其他部位的模板一起拆除,甚至有时在拆除模板时,后浇带处的混凝土工程还在继续,因此。拆除模板的后果是显而易见的。上面提到,后浇带的位置通常选择在梁、板跨的1∕3处,在浇筑混凝土之前,往往只有钢筋相连,当模板拆除后,缺乏有力的支撑而使得该结构成为了一个悬挑结果,来自于各方面的负荷以及其自身的重力,都会使后浇带的两侧发生向下的预应力,因此,意识到模板以及其支撑系统过早拆除对建筑结构产生的影响后。在对模板以及其支撑系统的质量进行监理时,最好做到事前控制,当需耍拆除模板時,进行及时的整改方案,减少模板拆除对建筑结构造成的影响。
2.后浇带平面布置的质量控制
通常情况下,后浇带的平面布置形式多为在建筑物种各楼层上下的同一个位置设置一条纵向的直线带,这是目前较为常用的后浇带布置方法,但是其存在着一定的弊端:由于其平面布置时上下位置统一在同一个直线上,容易引起该部位的应力集中,进而导致工程完工后产生贯通裂缝。因此,在对后浇带的平面布置进行监理时,首先需要在施工方案中对该部位的施工进行设计,在支模方法的选择上,应当杜绝在断面接缝处夹木板条的方法;其次,在进行模板设计时,可以优先考虑用钢丝网,因为钢丝网具有较好的柔性,而且施工过程中使用起来比较方便,不容易跑模,可以考虑作为永久性模板使用。
3.后浇带施工的质量控制
(1)对混凝土浇筑时间的控制。现行的规范中没有对混凝土的浇筑时间进行详细的要求,因此对其在具体施工中的时间需要根据工程实际情况而定。笔者认为,最好的浇筑时间应当是在主体结构施工完成并且沉降变形趋于稳定后进行,如果是主体结构较大的建筑工程。其施工时间可能要超过2个月,如果根据规范中规定的42天或者2个月的期限就无法保证在施工后进行浇筑,适当的浇筑时间也是防止后浇带出现裂缝的一个重要保证。
(2)对混凝土配制质量的控制。关于后浇带混凝土的配制,也存在着多种说法,有的工程强调原强度等级,有的工程比原强度等级高出一二级甚至更多。然而,当混凝土的原强度提高时,也意味着其中的水泥掺量比较大,也就是混凝土的收缩性会更大,往往容易产生收缩裂缝。因此笔者认为,施工方应当根据设计要求,通过实验室进行配比试验,同时在监理的见证下进行配制。
(3)对浇筑时的质量控制。在后浇带浇筑之前,应当对其两侧接缝进行清理,将积存的建筑垃圾进行清理,并且保持接缝的湿润;在浇筑过程中,应当在浇筑现场留置试块;同时在振捣时,对于两侧的接缝处不宜过振,否则容易引起浇筑混凝土与钢筋产生脱裂。在进行浇筑时,监理应该做好旁站工作,对浇筑过程中的问题及时发现并且及时处理。
三、结束语
总之。混凝土后浇带是容易产生质量和安全的重要因素,如果对后浇带的施工工艺处理不当,则会与设计初衷背离,使后浇带质量受到影响,进而影响到整个建筑工程的质量。因此,监理人员亦应积极掌握该部位科学合理的施工工艺及先进经验并加强检查、旁站监理,确保后浇带的施工。
参考文献:
[1]杨洪涛,邱学春.谈谈混凝土后浇带的施工监理[J].今日科苑,2009,(10)
[2]潘国庆,周银堂.混凝土后浇带施工监理的分析[J].中国新技术新产品,2009,(07)
[3]张华辉.浅谈建筑工程施工阶段的监理质量控制[J].科技创新导报,2009,(12)
[4]晦若文.建筑工程中混凝土后浇带的施工监理[J].中国新技术新产品,2009,(18)
[5]宋德望.混凝土后浇带施工监理应注意的事项[J].建设监理,2008,(04)
关键词:建筑工程混凝土后浇带监理要点
Abstract: in recent years, with the rapid economic development of our country, the construction industry and building engineering technology has also made great progress, and concrete pouring belt construction craft a wide range of applications, this technology can effectively ensure the complete structure building, at the same time, avoid the happening of irregular settlement. Based on the experience of the construction and supervision of the pouring belt quality control to a shallow analysis, summarizes the supervision of the pouring belt quality control points.
Keywords: building engineering concrete pouring belt supervision points
中图分类号:U415.1 文献标识码:A文章编号:
长期以来,建筑工程中往往要在混凝土施工时留设后浇带,其目的在于对建筑工程结构产生不均匀沉降时,或者由于温度湿度以及其他原因造成混凝土裂缝问题时提供有效的解决措施;同时后浇带施工工艺也多用于一些不便于设置变形缝的建筑工程中。目前我国建筑行业的相关规范中,对于混凝土后浇带施工工艺缺乏明确的规定,因此在实际施工过程中,有着各种各样的混凝土后浇带施工工艺,而有些不完善的做法会对建筑物本身的结构产生严重的影响,因此,对于混凝土后浇带施工工程的监督和检查就显得尤为重要,本文就对混凝土后浇带施工的监理工作要点进行初步的分析,希望以此为监理工程师提供参考。
一、混凝土后浇带的设计要求
1.后浇带位置的选择
混凝土施工过程中,对后浇带的位置选择十分重要,如果不能留设准确的后浇带,则不仅无法发挥其作用,反而会对建筑物自身的结构产生影响。我国现行地下工程防水技术规范中规定:“后浇带应设在受力和变形较小的部位,间距宜为30m~60m”。而在实际的工程施工中,后浇带的位置应当由设计者根据工程的类型、结构以及地质条件等具体情况进行计算来确定,现行的工程设计规范中,设计者往往将后浇带的位置选择在梁、板跨的1∕3处,也有个别工程设计中没有对具体尺寸进行标注而只简单的标出了后浇带大致的位置。
2.后浇带宽度的确定
后浇带宽度的确定往往需要与板、墙的厚度相适应。现行GB50108-2001规定“后浇带的宽度宜为700mm-1000mm”。在实际的工程中,后浇带的宽度应当由设计者根据工程的现场情况以及工程的地理位置来决定,在确定后浇带的宽度时,应当遵循宜窄不宜宽的原则,通常情况下,设计者都将后浇带的宽度设计为800mm。
3.后浇带形式的选择
后浇带的形式指的就是后浇带两侧混凝土接缝处的断面形式,常用的后浇带形式一般有平直缝、企口缝、阶梯缝、V形缝等四种形式。在实际工程中,应当根据工程的实际情况,以及后浇带的位置、宽度等综合因素确定所需要的后浇带形式,并且需要绘制详细的施工图纸。
4.后浇带的钢筋处理
关于后浇带处的钢筋是否需要断开,应当由设计者根据后浇带的形式以及设置后浇带的目的而来决定。后浇带处的钢筋贯通会对其两侧的混凝土产生制约,当钢筋产生拉应力时,则会造成后浇带处混凝土发生裂缝;后浇带处的钢筋如果断开,则能够使应力得到有效的释放。通常情况下,沉降用后浇带的钢筋一般选择贯通。而伸缩后浇带的钢筋则应该断开;梁板结构中,板筋需要断开,而梁筋需要贯通。当钢筋断开后需要进行连接时,可以采用搭接和焊接的方式,搭接的钢筋数应当小于25%,焊接的钢筋应当锚在同一个位置,不能离开断开位置的一半以上。
5.后浇带的防水措施
在实际工程中,后浇带应该具有一定的防水措施,尤其是后浇带接缝处的防水工作,能够有效的防止渗漏的发生。一般情况下所采用的防水措施,是将止水条预埋在后浇带的接缝处或者将止水带贴在后浇带的接缝处。当后浇带施工需要提前止水时,可以将后浇带部位混凝土的局部进行加厚同时增设止水带。要严格按照施工图纸和GB50108-2001地下工程防水技术规范要求施工,保证防水构造措施施工质量。
二、混凝土后浇带施工过程的质量控制
1.模板以及其支撑系统的质量控制
经过笔者多年的实践经验中得出,后浇带的模板支撑系统是最容易发生质量问题的环节,其常见的质量问题表现在不设置独立的支撑、拆模体系。由于缺乏独立的支撑系统,则使得后浇带处的模板必须要连同其他部位的模板一起拆除,甚至有时在拆除模板时,后浇带处的混凝土工程还在继续,因此。拆除模板的后果是显而易见的。上面提到,后浇带的位置通常选择在梁、板跨的1∕3处,在浇筑混凝土之前,往往只有钢筋相连,当模板拆除后,缺乏有力的支撑而使得该结构成为了一个悬挑结果,来自于各方面的负荷以及其自身的重力,都会使后浇带的两侧发生向下的预应力,因此,意识到模板以及其支撑系统过早拆除对建筑结构产生的影响后。在对模板以及其支撑系统的质量进行监理时,最好做到事前控制,当需耍拆除模板時,进行及时的整改方案,减少模板拆除对建筑结构造成的影响。
2.后浇带平面布置的质量控制
通常情况下,后浇带的平面布置形式多为在建筑物种各楼层上下的同一个位置设置一条纵向的直线带,这是目前较为常用的后浇带布置方法,但是其存在着一定的弊端:由于其平面布置时上下位置统一在同一个直线上,容易引起该部位的应力集中,进而导致工程完工后产生贯通裂缝。因此,在对后浇带的平面布置进行监理时,首先需要在施工方案中对该部位的施工进行设计,在支模方法的选择上,应当杜绝在断面接缝处夹木板条的方法;其次,在进行模板设计时,可以优先考虑用钢丝网,因为钢丝网具有较好的柔性,而且施工过程中使用起来比较方便,不容易跑模,可以考虑作为永久性模板使用。
3.后浇带施工的质量控制
(1)对混凝土浇筑时间的控制。现行的规范中没有对混凝土的浇筑时间进行详细的要求,因此对其在具体施工中的时间需要根据工程实际情况而定。笔者认为,最好的浇筑时间应当是在主体结构施工完成并且沉降变形趋于稳定后进行,如果是主体结构较大的建筑工程。其施工时间可能要超过2个月,如果根据规范中规定的42天或者2个月的期限就无法保证在施工后进行浇筑,适当的浇筑时间也是防止后浇带出现裂缝的一个重要保证。
(2)对混凝土配制质量的控制。关于后浇带混凝土的配制,也存在着多种说法,有的工程强调原强度等级,有的工程比原强度等级高出一二级甚至更多。然而,当混凝土的原强度提高时,也意味着其中的水泥掺量比较大,也就是混凝土的收缩性会更大,往往容易产生收缩裂缝。因此笔者认为,施工方应当根据设计要求,通过实验室进行配比试验,同时在监理的见证下进行配制。
(3)对浇筑时的质量控制。在后浇带浇筑之前,应当对其两侧接缝进行清理,将积存的建筑垃圾进行清理,并且保持接缝的湿润;在浇筑过程中,应当在浇筑现场留置试块;同时在振捣时,对于两侧的接缝处不宜过振,否则容易引起浇筑混凝土与钢筋产生脱裂。在进行浇筑时,监理应该做好旁站工作,对浇筑过程中的问题及时发现并且及时处理。
三、结束语
总之。混凝土后浇带是容易产生质量和安全的重要因素,如果对后浇带的施工工艺处理不当,则会与设计初衷背离,使后浇带质量受到影响,进而影响到整个建筑工程的质量。因此,监理人员亦应积极掌握该部位科学合理的施工工艺及先进经验并加强检查、旁站监理,确保后浇带的施工。
参考文献:
[1]杨洪涛,邱学春.谈谈混凝土后浇带的施工监理[J].今日科苑,2009,(10)
[2]潘国庆,周银堂.混凝土后浇带施工监理的分析[J].中国新技术新产品,2009,(07)
[3]张华辉.浅谈建筑工程施工阶段的监理质量控制[J].科技创新导报,2009,(12)
[4]晦若文.建筑工程中混凝土后浇带的施工监理[J].中国新技术新产品,2009,(18)
[5]宋德望.混凝土后浇带施工监理应注意的事项[J].建设监理,2008,(04)