论文部分内容阅读
将日历翻同到半年前,2015年4月,国家主席习近平对巴基斯坦进行国事访问,与巴基斯坦总理纳瓦兹·谢里夫共同为特变电工新能源公司承建的巴国最大太阳能100MW光伏项目并网发电揭牌。这个项目的背后始终有一个身影默默相随,它就是中国银行新疆分行。该项目位于旁遮普省“中巴经济走廊”辐射区域,合同总价达2.15亿美元,从合同签订到项目执行,都由中国银行新疆分行全程提供授信和担保支持。这也成为该行服务“丝绸之路经济带”建设、支持新疆本土企业“走出去”承揽海外工程项目的一个典范。记者了解到,秉承“担当社会责任,
Six months ago, in April 2015, President Xi Jinping paid a state visit to Pakistan and jointly with Pakistan’s Prime Minister Nawaz Sharif the grid-connected generation of 100MW of the largest solar PV project in Pakistan for TBEA New Energy. Unveiled. Behind this project there is always a figure in silence, it is the Bank of China Xinjiang Branch. The project is located in the Punjab ”CMB Economic Corridor “ radiation area, with a total contract value of 215 million U.S. dollars. From the signing of the contract to the execution of the project, the Bank of China Xinjiang Branch provides credit and guarantee throughout the project. It has also become a model for the bank to serve the construction of the ”Silk Road Economic Belt“ and to support the local enterprises in Xinjiang to ”go global“ in overseas projects. This reporter learned that adhering to the ”social responsibility,