论文部分内容阅读
一九八五年十月,我厂大修一辆解放CA10B型汽车。在修理变速器时,更换了变速器壳,第一轴,第一轴后球轴承,四、五档滑动齿套,第二轴一、倒档齿轮,第二轴二、三档滑动齿轮,第二轴前端滚针轴承,第二轴后球轴承等零件。其它零件均在大修允许范围内没有更换,变速器装配后运转正常。修理发动机时,进行了镗缸、磨轴、镗瓦、更换了飞轮壳。汽车总装
In October 1985, I overhauled a factory to liberate CA10B cars. In the repair of the transmission, the replacement of the transmission shell, the first axis, the first axis ball bearings, fourth and fifth gear sliding sleeve, the second shaft one, reverse gear, the second shaft two or three gear sliding gear, the second Axle needle roller bearings, the second axis after the ball bearings and other parts. Other parts are not overhauled within the scope of the replacement, the transmission assembly is functioning properly. Repair engine, carried out boring cylinder, grinding shaft, boring tile, replaced the flywheel housing. Car assembly