由于水源缺乏、水质硬度高和腐蚀性强等因素,并吸取了在以前建成的第一气体处理厂和第二气体处理厂应用蒸汽锅炉管理难度大、运行费用高和安全性差等教训,在第三气体处理厂(中原LPG厂)建设中引进了原西德林德(LINDE)公司的燃气轮机余热回收导热油循环加热技术。1.燃气轮机余热回收热油系统工艺
Due to the lack of water, high water hardness and corrosiveness and other factors, and lessons learned in the previous first gas processing plant and the second gas treatment plant application of steam boiler management difficult, high operating costs and poor safety lessons, the first Third gas treatment plant (Central Plains LPG plant) the construction of the introduction of the former West Lindh (LINDE) company gas turbine heat recovery heat transfer oil circulation heating technology. 1. Gas turbine waste heat recovery hot oil system technology