主要阐述了8号楼、10号楼、11号楼转换层框支梁模板支设和混凝土浇筑的施工过程,着重说明了转换层高大模板支设和大体积混凝土浇筑等关键技术,为类似转换层结构形式的施工提供参考与借鉴。
Mainly elaborated the building process of 8th floor, 10th floor and 11th floor conversion floor beam support and the concrete pouring. The key technologies such as high-level formwork support and mass concrete pouring are emphasized. Layers of the form of construction to provide reference and reference.