目前大型矿井副立井提升一般装备2套提升设备,一套升降矸石、物料、人员及设备,另一套交通罐用于升降零星人员,并在主提升设备故障时进行应急提升。但是小型矿井副立井一般只装备一套提升设备,在故障时井下人员不能安全升井。统计表明,副立井故障一般为电气设备故障,主要包括电动机和电控系统。提出备用一套电动机及电控系统,在主系统设备故障时,采用备用系统将井下人员安全升井。
At present, the deputy shaft of large-scale mine shaft is upgraded with 2 sets of general equipment, one set of lifting gangue, materials, personnel and equipment. The other set of transport tanks is used for lifting and lowering sporadic personnel and emergency upgrading when the main lifting equipment fails. However, the deputy shaft of a small mine generally only equipped with a lifting equipment, downhole personnel in the event of failure can not be safe. Statistics show that the auxiliary shaft fault is generally electrical equipment failure, including motor and electric control system. Put forward a set of spare motor and electronic control system, the main system equipment failure, the use of backup systems to mine safety personnel downhole.