在分析当前轨道交通工程建设安全现状基础之上,提出了利用轨道交通工程安全管理系统进行数据采集和整理的新方法;运用改进的动态规划模型对数据进行分析,计算出轨道交通工程建设的最优化工期。该改进的算法能够在一定程度上节省轨道交通工程建设成本,具有一定的创新性和实用价值。
Based on the analysis of the current status quo of rail transit construction safety, a new method of data acquisition and arrangement using the safety management system of rail transit engineering is put forward. By using the improved dynamic programming model to analyze the data and calculate the most Optimize the construction period. The improved algorithm can save the construction cost of the rail transit project to a certain extent, and has certain innovative and practical value.