间断连续运输工艺是深凹露天矿的高效运输工艺,已成为深凹露天矿运输工艺的重要发展方向。因此,对该工艺几项关键技术,即系统最优初始深度的确定,半固定破碎站移设步距的确定,以及运输系统开拓布置方式的选择进行了研究和探讨,建立了数学模型与算法理论,并以实际矿山为例,进行了研究验证。
The intermittent continuous transportation process is an efficient transportation technology for the deep open pit mine and has become an important development direction of the deep open pit transportation technology. Therefore, several key technologies of the process, namely, the determination of the optimal initial depth of the system, the determination of the moving distance of the semi-fixed crushing station, and the selection of the open layout of the transportation system are discussed and discussed. Mathematical models and algorithms Theory, and the actual mine, for example, conducted a research verification.