针对目前国内水利工程建设普遍存在的对项目前期的风险评估、项目后评价、运营综合管理重视不足等问题,本文结合世界银行和亚洲银行的全寿命周期评估决策程序,分析了项目后评价主要工作和基本原则,指出了建立水利工程项目后评价体系存在的问题。
In view of the problems such as pre-project risk assessment, post-project evaluation and insufficient attention of integrated operation management in the current construction of domestic water conservancy projects, this paper analyzes the decision-making process of the whole life cycle of the World Bank and Asian Bank and analyzes the main work of post-evaluation And basic principles, pointed out the problems existing in the post-evaluation system of water conservancy projects.