对淄博市体育中心体育场项目高架支模与悬挑斜梁施工方法进行了详细分析。工程施工周期短、投资控制严格,主体施工图设计单位没有事先考虑利用结构梁板作为施工支撑面,在此情况下进行了周密论证,主体施工图设计单位配合进行施工阶段验算,最终优化出完善、可行的施工技术,与各位同行进行交流。
The construction method of overhead support cantilever beam and cantilevered beam in Stadium of Zibo Sports Center Stadium are analyzed in detail. The project construction period is short and the investment control is strict. The main construction drawing design unit did not consider using the structural beam plate as the construction supporting surface in advance. In this circumstance, it conducted careful argumentation and the main construction drawing design unit cooperated with the construction phase checking and finally optimized the perfection , Feasible construction technology, communicate with all of you.