论文部分内容阅读
DAPEIN(Ⅰ)水电站位于中缅边界的缅甸境内,是一座引水式水电站,是以发电为唯一开发目标的工程。首部枢纽截流采用上游围堰单戗堤立堵截流方式,龙口宽度50m,截流标准采用11月份P=20%月平均流量。
DAPEIN (Ⅰ) Hydropower Station is located in Burma on the Sino-Burmese border. It is a diversion-type hydropower station and is the only project with power generation as the sole target. The closure of the first hub adopts the single cofferdam embankment blocking cutoff method of the upstream cofferdam. The width of the longkou is 50m. The closure standard adopts the monthly average flow rate of P = 20% in November.