论文部分内容阅读
水利水电工程中最常使用的原料有石头和土料,其中土料是工程基础,堤段培厚加固工程使用的是土料,在堤身培厚加固工程中使用土料方数多,工期短,工程量大是这类工程的难点,在施工过程中不但要控制质量,还要保证施工进度(工期)。本文作者介绍了大堤堤防培厚加固堤身填筑的土料选取,基础开挖,严格控制填土施工过程和填土应注意的事项。
The most commonly used raw materials in water conservancy and hydropower projects are stone and soil materials, of which the soil material is the foundation of the project, the material used for the reinforcement and reinforcement works of the embankment section is soil material, Large quantities of engineering is the difficulty of such projects, not only in the construction process to control the quality, but also to ensure the construction schedule (duration). The author of this paper introduces the embankment embankment thickened and reinforced embankment fill material selection, foundation excavation, strict control of filling construction process and filling should pay attention to matters.