通过工程实例,参照单元体幕墙的制作、安装方式,在框架式幕墙的设计基础上,通过在幕墙连接节点的设计改进,预埋件的安装、施工测量、预埋件处理、连接件安装、单元体式板块制作、吊装、安装质量检查、成品保护等方面的施工管理,能够有效地缩短幕墙工程施工工期和工程总工期,并达到原幕墙设计要求的整体效果,保证工程建设的质量、安全、进度和效益。
Based on the design of frame curtain wall and the design of curtain wall joints, the design of curtain wall joints, the installation of embedded parts, the construction measurement, the treatment of embedded parts, the installation of connecting pieces, The construction management of unit body plate production, lifting, installation quality inspection and finished product protection can effectively shorten the construction period and the total construction period of the curtain wall project and achieve the overall effect of the original curtain wall design requirements and ensure the quality, safety, Progress and effectiveness.