河南省南水北调受水区供水工程输水管道静水压试验是完工验收之前的一个试验项目,旨在检验管道安装的严密性,以便及早发现问题、解决问题。当前河南省南水北调受水区供水工程已进入关键时期,管道工程进入收尾阶段,静水压试验将全面展开。基于此,文章就静水压试验实施的时机、条件、方法及注意事项进行探讨,以便为下一步静水压试验提供有益借鉴。
Hydrostatic Pressure Test of Water Supply Project of Water Supply Project of South-North Water Diversion Project in Henan Province is a pilot project before completion inspection, aiming to test the tightness of pipeline installation in order to detect and solve problems as soon as possible. At present, the water supply project of South-to-North Water Diversion Project in Henan Province has entered a crucial period, and the pipeline project is in the final stage of completion. The hydrostatic test will be conducted in full swing. Based on this, the article discusses the timing, conditions, methods and precautions of the hydrostatic test in order to provide useful reference for the next hydrostatic test.