某超高层结构高度216.4 m,是一栋超高层酒店兼办公综合体。本工程场地持力层起伏很大,基础持力层条件不好,本工程采用人工挖孔桩基础形式保证成桩质量;并针对该项目核心筒面积小的特点,提出了椭圆形的人工挖孔桩排桩方案,桩排布在主要竖向结构下方;该方案桩受力合理且施工方便,是一个可以推广的基础设计方案。另外,对连廊连接以及圆钢管混凝土柱及钢梁节点以及人工挖孔桩设计、施工要点等进行了阐述,供其他类似工程做借鉴。
A super high-rise structure of 216.4 m height, is a super-high-rise hotel and office complex. The project area has a great fluctuation of the holding power and the conditions of the foundation bearing layer are not good. The quality of the pile is ensured by the manual foundation digging pile. In view of the small core area of the project, the oval artificial digging Piles pile piles, pile arrangement in the main vertical structure below; the program pile force reasonable and convenient construction, is a promotion of basic design. In addition, the connection of corridors, the design of CFST columns, steel beam joints and artificial digging piles, the construction points and so on are also described for reference to other similar projects.