风电项目交通道路防治区是项目新增水土流失量最大的单元,是水土流失监测和防治的重点区域。依据开挖回填情况将风电项目交通道路防治区分为平缓路段(平地、山脊处路段)、全挖方路段、全填方路段和半挖半填路段四种类型区,并结合各种类型区的特点选择性地实施表土剥离及返还、排水沟、边坡防护、植物措施等水土保持措施,最大程度地防治因项目建设而造成的水土流失。
The traffic road prevention and control area of the wind power project is the new unit with the largest amount of soil and water loss and is the key area for soil erosion monitoring and prevention. Based on the excavation and backfilling situation, the traffic road prevention and control of wind power projects are divided into four types of areas: smooth sections (flat land and ridge sections), full excavation sections, full filling sections and semi-excavation and semi-reclamation sections. Combined with the characteristics of various types of areas Selectively carry out topsoil stripping and return, drainage ditch, slope protection, plant measures and other soil and water conservation measures to minimize the water and soil loss caused by the project construction.