论文部分内容阅读
对利洞水电站碾压混凝土重力坝、混凝土面板堆石坝两种枢纽布置方案进行了比较 ,提出了推荐方案 ,阐述了兴建利洞水电站的必要性。
The comparison is made between two schemes of RCC gravity dam and concrete faced rockfill dam at the Lidong Hydropower Station, and a proposal is put forward to explain the necessity of constructing the Lidong Hydropower Station.