呈东联合站是一座大型的油气集输工程,是油田的重点工程之一。主要工程分为原油脱水、原油集输、供变电、天然气处理、污水处理等五大系统。总建筑面积2302平方米。共有机泵78台、大型容器44台、5000立方米金属罐5台、1000立方米金属罐2台、其它金属罐7台、各种伐件1797套、各种管线43km,以及道路和围墙。工程结算投资2388万元。该工程工作量大、工艺要求高、标准要求高、工程要求紧、施工难度大,属系统配套工程。我们按照项目法组织施工,1991年7月15日开工,12月21日投产,比合同工期缩短11天。做到全站整
East East United Station is a large-scale oil and gas gathering and transportation project and one of the key projects in the oil field. The main projects are divided into five major systems: crude oil dehydration, crude oil gathering, power generation, natural gas processing, and sewage treatment. The total construction area is 2302 square meters. A total of 78 organic pumps, 44 large-scale vessels, 5 5000 cubic meters of metal cans, 2 metal cans of 1000 cubic meters, 7 other metal cans, 1797 sets of various pieces of cutting, 43km of various pipelines, as well as roads and walls. The project settlement investment is 23.88 million yuan. The project has a large workload, high technological requirements, high standards, tight engineering requirements, and difficult construction. It is a system supporting project. We organized the construction according to the project law, started work on July 15, 1991 and started production on December 21, shortening the contract period by 11 days. Do the whole station