研究目的:根据客运专线铁路电力电源工程建设中出现的问题,研究优化设计方案的思路和减少外界制约因素的有关注意事项。研究结论:客运专线铁路电力变配电所电源工程受各方制约因素较多;电源工程应以安全可靠、经济适用为原则;关注供电能力和用电需求的近远期关系和电源本体工程与市政管沟投资的关系等设计要点和注意事项;特大型站房或枢纽应优先充分利用牵引电源。本研究可为类似铁路电力电源线路工程的建设提供借鉴。
Research purposes: According to the problems occurred in the construction of railway power and power engineering of passenger dedicated railway line, the thought of optimizing the design scheme and the precautions to reduce the external constraints should be studied. Research conclusions: The power supply project of railway power transformer substation in passenger dedicated railway line is subject to many constraints; the power supply project should be based on the principles of safety, reliability and economy; the close and long-term relationship concerning power supply capacity and power demand, Municipal management and investment relationship between the design points and precautions; extra large station or hub should give priority to full use of traction power. This study can provide reference for the construction of similar railway power supply lines.