【摘 要】安全生产是一项重大、艰巨、长期、复杂的工作, 安全生产人人有责,任何人、任何时间、任何环境都不能有任何麻痹思想。而要实现安全管理的长治久安,既需要每个施工企业各级领导的高度重视和整体配合,也需要全体职工共同自觉的努力;既需要科学有效的控管手段,也需要每个人脚踏实地、艰苦细致的工作;切实重视和加强安全文明施工,是促进生产力发展、经济发展和社会稳定的迫切需要,是践行“三个代表”重要思想的具体体现,更是全面落实科学发展观和构建社会主义和谐社会的实际行动。
【关键词】水利工程施工;安全隐患;安全管理
The problem and counterplan try theory marine hydraulic engineering a safety civilization construction
Ruan Eng-dian
(Hangzhou water electricity building limited company Hangzhou Zhejiang 310000)
【Abstract】Safety produce is a graveness, the Jian be huge, long-term, complications of work, safety produce the everyone contain responsibility, anyone, any time, any environment can't have any paralyze thought.But want realization safety management of long cure long Anne, since demand each construction business enterprise all levels leadership of height value with whole match, also demand all officers and workers together aware of self of effort;Since demand science valid of control means, also demand everybody practical, hard meticulous of work;Practical value with strengthen safety civilization construction, is promote productivity development, economy development and society stability of urgent demand, is a Jian line“three representative” importance thought of concrete body now, is also overall implementation science development view with set up socialism harmony society of actual activity.
【Key words】Marine hydraulic engineering construction;The safety is concealed to suffer from;Safety management
近年来,随着国家对水利行业投入的加大,各地水利工程建设项目纷纷上马,水利工程施工的安全问题也逐步凸显出来,贯彻安全法规和标准,深化文明施工管理,对水利工程施工尤其迫切。
1. 水利工程施工过程中存在的安全隐患
(1)水利工程往往施工战线长,施工班组较多,工地之间的距离较大,交通联系多有不便,系统的安全管理难度大。
(2)水利工程多涉河道治理、水库大坝、沿海堤防施工项目,受汛期及潮汐影响,必须保证洪水和潮汐等因素侵袭情况下的施工安全,而上述因素均与气象有关,很难准确把握,对施工安全管理存在较大隐患。
(3)水利工程施工现场多为“敞开式”施工,无法进行有效的封闭隔离,对施工对象、工地设备、材料、人员的安全管理增加了很大的难度。
(4)水利工地招用民工普遍文化层次较低,且多为建筑工人,不了解水利工程建设规程,在项目实施过程中安全适应应变能力相对较差,增加了安全隐患。
2. 水利工程安全文明施工管理策略
2.1 强化安全管理,做好安全预防。
首先应使各施工单位最高管理人树立强烈的安全意识。在水利工程施工中能否坚持“安全第一”,关键取决于施工单位管理层领导和工程项目部主要负责人能否把安全作为各项工作之前首先考虑的问题,为此施工单位应明确提出把安全作为管理层领导和项目经理及技术负责人考核的主要依据之一,并采用一票否决制;凡出现安全事故,并追究相应领导的责任,年度考核不合格,视情节扣发年度奖金,直至解聘和辞职。通过“一票否决制”,促使和激发从管理层到项目部人员抓安全的自觉性。其次,以人为本,强化广大职工,民工的安全责任意识。切实改变民工心中你要我安全的心态,变成我要安全的心态,通过三级安全教育和一票否决的制度提高职工、民工对安全的责任感。
2.1.1 安全文明施工基础设施项目。主要指工程开工初期为满足工程安全文明施工需要而实施的临时性工程项目,应该与现行招标文件中“临时设施”章节和相应的工程量清单相区别。现行招标文件工程量清单“临时设施”中为保证正常施工和工人生活所必须的生产、生活项目内容仍列为“临时设施”,其他为满足安全生产、文明施工、工人健康生活所需要的内容列为“安全文明施工基础设施项目”,并根据需要补充若干细项。在编写“安全文明施工基础设施项目”时,应特别注意针对现行工程建设中安全文明施工方面的薄弱环节和常见问题提出项目要求。
2.1.2 安全文明施工过程控制项目。主要指永久工程施工过程中为确保安全文明施工需要而实施的项目,根据拟招标的工程项目性质、规模、内容确定。可以按工程项目的施工过程划分若干阶段性控制要素,也可以按工程项目工序内容划分若干控制范围。招标文件中对安全检查考核的标准、频次、方法要给予明确,要将“安全文明施工过程控制项目”中的相关内容与工序质量控制内容一并查验,明确未经检查验收合格并签署书面意见,不得进入下一道工序施工。要通过规范化管理下决心解决水利工程施工中的粗放管理、平时脏乱差、临时突击清理打扫的陋习。要把安全文明施工的相关项目和工作内容与计量支付量化挂钩,促使施工单位主动加强管理。
2.2 制订安全制度,进行制度教育。
从业主到施工单位项目部,基层班组,在统一安全第一思想的基础上,层层制订落实安全制度。安全制度的制定依据要符合安全法律和行业规定,制度的内容齐全、针对性强,具有实效性和可操作性。制度制定后,要严格按照制度要求进行安全生产,并必须把经常性的安全教育贯穿于安全管理的全过程,根据接受教育的对象和不同特点,采取多层次、多渠道、多方法进行安全生产教育。
2.3 利用施工组织设计交底,进行安全施工技术教育。
为了使工程建设施工重大安全技术措施得以落实,应在项目施工前编制《安全防护手册》作为安全规范,发给全体职工进行认真学习,并利用施工组织设计或项目施工技术交底,进行本项目施工安全措施的教育,在编制施工组织设计时,应针对工程项目特点,提出本项目应特别强调的安全隐患及应对措施,通过对安全措施的交底和教育,使施工人员和每一位工人对工程施工总的安全要求和安全措施心中有底,这将给施工中落实具体的安全技术措施奠定基础。
2.4 施工队伍组建时拟安全管理,从组织上落实安全措施。
工程项目一上马,工地就应立刻建立以项目经理为第一责任人的安全管理体系,并在现场设质量安全员,赋予相应安全管理权力,包括违章作业制止权,严重隐患停工权,经济处罚权,安全一票否决权,保证其有效行使职责。在组建施工队伍、施工班组时,应选择技术过硬,安全质量意识强的人员。对于新入厂的工人和调换工种的工人应进行岗前安全教育和技术培训,特种作业人员,除按一般性安全教育外,还要按照行业规定进行特种专业培训,考核合格取得特种作业人员操作证后方可上岗。
2.5 做好施工过程的安全管理监控。
在水利工程施工安全管理工作中,施工过程的管理和监控是过程性的,管理的时间长、跨度大、涉及面广,同时也是考验安全管理是否有效的主要阶段。在施工过程的安全管理中,既要统筹兼顾,不留死角,又应集中力量抓好重点;既要重视施工高峰期的施工安全,又必须注意其它施工期间各个安全环节;既要严格控制关键工序安全操作规程,又要全面抓好一般工序施工的安全要求;既要抓好关键部位施工对象的施工安全,又应保证全部施工对象的安全生产。
2.6 推行激励机制,全面提升管理水平。
试行安全文明施工风险基金制度,具体奖惩办法由建设单位和施工单位签订。施工单位的现场项目经理部在取得第一次工程预付款时交纳一定数额的安全文明施工保证金,建设单位从合同备用金中提取相等数额的安全文明施工奖金,合并组成安全文明施工风险基金由建设处专户存储。40%的风险基金用于施工过程中“安全文明施工管理及绩效考评项目”的检查、考核兑现,20%的风险基金奖励水利系统文明工地,20%的风险基金奖励省、市级文明工地,工程结束未发生生产安全事故奖励20%的风险基金。安全文明施工的责任主体是施工单位,建设单位和监理单位主要起监管作用。要通过动态管理和激励机制,推动和促进施工单位增加安全文明施工投入,强化安全文明施工管理,全面提升安全文明施工管理水平。
3. 标准化、规范化安全文明施工现场管理实施方案
3.1 从合同文本入手,探索量化管理新思路。
量化管理的前提是合同文本。用通俗的语言说,就是建设单位(项目法人)在组织编写招标文件时,把自己想要达到的建设管理目标通过细的合同条款体现在招标文件中。在现行招标文件技术条款“一般规定”中增加“安全文明施工”章节,同时在商务文件“工程量清单”中列细项,并要求投标单位根据自己对招标文件的理解和工程安全文明施工的需要作补充。在此基础上由投标单位在业主确定的一定幅度内确定各子项报价。“安全文明施工”章节可以参照建设部《建筑施工安全检查标准》(JCJ59-99)、《建筑工程安全防护、文明施工措施费用及使用管理规定》(建办[2005]89号)、《浙江省建设工程现场安全文明施工措施费计价管理办法》(建设厅苏建价[2005]349号)、水利部《水利系统文明建设工地考核标准》(1998年4月)、《浙江省建筑施工省级文明工地评审暂行办法》(建设厅苏建建E2003]247号)等法规、办法,结合水利工程的施工特点,针对具体工程情况、施工条件和合同工期编写。相应合同条款中必须明确计量支付条件,并尽可能采用定量考核支付。建议“安全文明施工”章节分基础设施、过程控制、绩效考评3个层次编写。
3.1.1 安全文明施工基础设施项目。
主要指工程开工初期为满足工程安全文明施工需要而实施的临时性工程项目,应该与现行招标文件中“临时设施”章节和相应的工程量清单相区别。例如:职工宿舍、泥结碎石
道路属正常施工所必须的项目,而文化体育娱乐设施、混凝土道路属满足安全文明施工所需要的项目。从另一个角度说:“临时设施”项目是“必须”的,个数多少与工程大小、工期长短关系不大,仅规模不同;而“安全文明施工基础设施项目”是“需要”的,内容应区别工程大小、工期长短和创建文明工地期望达到的水平确定。现行招标文件工程量清单“临时设施”中为保证正常施工和工人生活所必须的生产、生活项目内容仍列为“临时设施”,其它为满足安全生产、文明施工、工人健康生活所需要的内容列为“安全文明施工基础设施项目”,并根据需要补充若干细项。在编写“安全文明施工基础设施项目”时,应特别注意针对现状工程建设中安全文明施工方面的薄弱环节和常见问题提出项目要求。
3.1.2 安全文明施工过程控制项目。
主要指永久工程施工过程中为确保安全文明施工需要而实施的项目,根据拟招标的工程项目性质、规模、内容确定。可以按工程项目的施工过程划分若干阶段性控制要素,也可以按工程项目工序内容划分若干控制范围。如:基坑降排水及安全围护、脚手板搭设及安全网围封、施工通道及临边洞口防护、安全用电及施工照明、成品保护及工作面清理、安全警示、环境保护、食堂卫生等等。招标文件中对安全检查考核的标准、频次、方法要给予明确,要将“安全文明施工过程控制项目”中的相关内容与工序质量控制内容一并查验,明确未经检查验收合格并签署书面意见,不得进人下一道工序施工。要通过规范化管理下决心解决水利工程施工中的粗放管理、平时脏乱差、临时突击清理打扫的陋习。要把安全文明施工的相
关项目和工作内容与计量支付量化挂钩,促使施工单位主动加强管理。
3.1.3 安全文明施工管理及绩效考评项目。
侧重于对施工单位的安全文明施工管理的检查、考核,包括专兼职安技人员配备、安全教育培训、持证上岗、危险源控制、安全自查及安全检查所提问题的落实整改等动态管理内容和上级有关部门对工程项目安全文明施工管理的评价(包括检查、稽查、文明工地评选等)。具体内容能量化的尽可能量化,并与费用挂钩。考评达不到分值要求的扣罚施工单位相关经费,管理成效明显经考评符合相应条件的,给施工单位予以奖励。
3.2 严格过程控制,推行规范化管理。
标准化、规范化管理的前提是标准,但更重要的是通过严格的过程控制确保符合标准,以实现规范化管理的目标。必须明确安全文明施工的检查程序、检查内容,并与经费挂钩。现状项目管理实践中,施工单位在投标文件施工组织设计章节中对文明工地设施所作的承诺经常不能全部兑现。究其原因既有合同不完善的一面,也有监控不力的一面。“安全文明
施工基础设施项目”基本上都是总价项目,实施过程中监理必须对照合同项目严格考核有无保质保量全部完成,否则该项报价应部分或全部不予计量支付。
推行标准化、规范化管理,不仅要看初期投入、环境状况,更要特别注重施工过程中的安全防护、安全文明措施和安全文明行为。施工单位进场以后,必须根据施工图和现场实际
情况对投标文件中的“安全文明施工过程控制项目”进一步细化后报监理批准。监理要制定针对性的检查、考核细则报建设单位批准后实施。在动态检查、考核的基础上对相应子项费
用分期支付,全部完成后结清。不满足合同条件的不予支付。
3.3 推行激励机制,全面提升管理水平。
试行安全文明施工风险基金制度,具体奖惩办法由建设单位和施工单位签订。施工单位的现场项目经理部在取得第一次工程预付款时交纳一定数额的安全文明施工保证金,建设单位从合同备用金中提取相等数额的安全文明施工奖金,(合并组成安全文明施工风险基金由建设处专户存储。40%的风险基金用于施工过程中“安全文明施工管理及绩效考评项目”的检查、考核兑现,20%的风险基金奖励省水利系统文明工地,20%的风险基金奖励省、部级文明工地,工程结束未发生生产安全事故奖励20%的风险基金。
安全文明施工的责任主体是施工单位,建设单位和监理单位主要起监管作用。要通过动态管理和激励机制,推动和促进施工单位增加安全文明施工投入,强化安全文明施工管理,全面提升安全文明施工管理水平。
3.4 建议。
在积极探索标准化、规范化安全文明施工管理的基础上,及时总结、交流,适时制定出台浙江省大中型水利工程建设管理标准化合格现场考核标准,根据标准化合格现场考核标准,经考核合格的工地才能逐级申报文明工地。为了鼓励创建文明工地,建议全省水利系统分省、市两级评选文明工地,原则上每年评选一次。评为文明工地的项目经理三年内可在
投标中获得评标加分。
在省厅的正确领导和工程建设领域参建各方的共同努力下,一定能全面推进标准化、规范化安全文明施工现场管理,打造健康、和谐、安全、文明发展的水利建设新形象。
[文章编号]1006-7619(2010)07-26-702
【关键词】水利工程施工;安全隐患;安全管理
The problem and counterplan try theory marine hydraulic engineering a safety civilization construction
Ruan Eng-dian
(Hangzhou water electricity building limited company Hangzhou Zhejiang 310000)
【Abstract】Safety produce is a graveness, the Jian be huge, long-term, complications of work, safety produce the everyone contain responsibility, anyone, any time, any environment can't have any paralyze thought.But want realization safety management of long cure long Anne, since demand each construction business enterprise all levels leadership of height value with whole match, also demand all officers and workers together aware of self of effort;Since demand science valid of control means, also demand everybody practical, hard meticulous of work;Practical value with strengthen safety civilization construction, is promote productivity development, economy development and society stability of urgent demand, is a Jian line“three representative” importance thought of concrete body now, is also overall implementation science development view with set up socialism harmony society of actual activity.
【Key words】Marine hydraulic engineering construction;The safety is concealed to suffer from;Safety management
近年来,随着国家对水利行业投入的加大,各地水利工程建设项目纷纷上马,水利工程施工的安全问题也逐步凸显出来,贯彻安全法规和标准,深化文明施工管理,对水利工程施工尤其迫切。
1. 水利工程施工过程中存在的安全隐患
(1)水利工程往往施工战线长,施工班组较多,工地之间的距离较大,交通联系多有不便,系统的安全管理难度大。
(2)水利工程多涉河道治理、水库大坝、沿海堤防施工项目,受汛期及潮汐影响,必须保证洪水和潮汐等因素侵袭情况下的施工安全,而上述因素均与气象有关,很难准确把握,对施工安全管理存在较大隐患。
(3)水利工程施工现场多为“敞开式”施工,无法进行有效的封闭隔离,对施工对象、工地设备、材料、人员的安全管理增加了很大的难度。
(4)水利工地招用民工普遍文化层次较低,且多为建筑工人,不了解水利工程建设规程,在项目实施过程中安全适应应变能力相对较差,增加了安全隐患。
2. 水利工程安全文明施工管理策略
2.1 强化安全管理,做好安全预防。
首先应使各施工单位最高管理人树立强烈的安全意识。在水利工程施工中能否坚持“安全第一”,关键取决于施工单位管理层领导和工程项目部主要负责人能否把安全作为各项工作之前首先考虑的问题,为此施工单位应明确提出把安全作为管理层领导和项目经理及技术负责人考核的主要依据之一,并采用一票否决制;凡出现安全事故,并追究相应领导的责任,年度考核不合格,视情节扣发年度奖金,直至解聘和辞职。通过“一票否决制”,促使和激发从管理层到项目部人员抓安全的自觉性。其次,以人为本,强化广大职工,民工的安全责任意识。切实改变民工心中你要我安全的心态,变成我要安全的心态,通过三级安全教育和一票否决的制度提高职工、民工对安全的责任感。
2.1.1 安全文明施工基础设施项目。主要指工程开工初期为满足工程安全文明施工需要而实施的临时性工程项目,应该与现行招标文件中“临时设施”章节和相应的工程量清单相区别。现行招标文件工程量清单“临时设施”中为保证正常施工和工人生活所必须的生产、生活项目内容仍列为“临时设施”,其他为满足安全生产、文明施工、工人健康生活所需要的内容列为“安全文明施工基础设施项目”,并根据需要补充若干细项。在编写“安全文明施工基础设施项目”时,应特别注意针对现行工程建设中安全文明施工方面的薄弱环节和常见问题提出项目要求。
2.1.2 安全文明施工过程控制项目。主要指永久工程施工过程中为确保安全文明施工需要而实施的项目,根据拟招标的工程项目性质、规模、内容确定。可以按工程项目的施工过程划分若干阶段性控制要素,也可以按工程项目工序内容划分若干控制范围。招标文件中对安全检查考核的标准、频次、方法要给予明确,要将“安全文明施工过程控制项目”中的相关内容与工序质量控制内容一并查验,明确未经检查验收合格并签署书面意见,不得进入下一道工序施工。要通过规范化管理下决心解决水利工程施工中的粗放管理、平时脏乱差、临时突击清理打扫的陋习。要把安全文明施工的相关项目和工作内容与计量支付量化挂钩,促使施工单位主动加强管理。
2.2 制订安全制度,进行制度教育。
从业主到施工单位项目部,基层班组,在统一安全第一思想的基础上,层层制订落实安全制度。安全制度的制定依据要符合安全法律和行业规定,制度的内容齐全、针对性强,具有实效性和可操作性。制度制定后,要严格按照制度要求进行安全生产,并必须把经常性的安全教育贯穿于安全管理的全过程,根据接受教育的对象和不同特点,采取多层次、多渠道、多方法进行安全生产教育。
2.3 利用施工组织设计交底,进行安全施工技术教育。
为了使工程建设施工重大安全技术措施得以落实,应在项目施工前编制《安全防护手册》作为安全规范,发给全体职工进行认真学习,并利用施工组织设计或项目施工技术交底,进行本项目施工安全措施的教育,在编制施工组织设计时,应针对工程项目特点,提出本项目应特别强调的安全隐患及应对措施,通过对安全措施的交底和教育,使施工人员和每一位工人对工程施工总的安全要求和安全措施心中有底,这将给施工中落实具体的安全技术措施奠定基础。
2.4 施工队伍组建时拟安全管理,从组织上落实安全措施。
工程项目一上马,工地就应立刻建立以项目经理为第一责任人的安全管理体系,并在现场设质量安全员,赋予相应安全管理权力,包括违章作业制止权,严重隐患停工权,经济处罚权,安全一票否决权,保证其有效行使职责。在组建施工队伍、施工班组时,应选择技术过硬,安全质量意识强的人员。对于新入厂的工人和调换工种的工人应进行岗前安全教育和技术培训,特种作业人员,除按一般性安全教育外,还要按照行业规定进行特种专业培训,考核合格取得特种作业人员操作证后方可上岗。
2.5 做好施工过程的安全管理监控。
在水利工程施工安全管理工作中,施工过程的管理和监控是过程性的,管理的时间长、跨度大、涉及面广,同时也是考验安全管理是否有效的主要阶段。在施工过程的安全管理中,既要统筹兼顾,不留死角,又应集中力量抓好重点;既要重视施工高峰期的施工安全,又必须注意其它施工期间各个安全环节;既要严格控制关键工序安全操作规程,又要全面抓好一般工序施工的安全要求;既要抓好关键部位施工对象的施工安全,又应保证全部施工对象的安全生产。
2.6 推行激励机制,全面提升管理水平。
试行安全文明施工风险基金制度,具体奖惩办法由建设单位和施工单位签订。施工单位的现场项目经理部在取得第一次工程预付款时交纳一定数额的安全文明施工保证金,建设单位从合同备用金中提取相等数额的安全文明施工奖金,合并组成安全文明施工风险基金由建设处专户存储。40%的风险基金用于施工过程中“安全文明施工管理及绩效考评项目”的检查、考核兑现,20%的风险基金奖励水利系统文明工地,20%的风险基金奖励省、市级文明工地,工程结束未发生生产安全事故奖励20%的风险基金。安全文明施工的责任主体是施工单位,建设单位和监理单位主要起监管作用。要通过动态管理和激励机制,推动和促进施工单位增加安全文明施工投入,强化安全文明施工管理,全面提升安全文明施工管理水平。
3. 标准化、规范化安全文明施工现场管理实施方案
3.1 从合同文本入手,探索量化管理新思路。
量化管理的前提是合同文本。用通俗的语言说,就是建设单位(项目法人)在组织编写招标文件时,把自己想要达到的建设管理目标通过细的合同条款体现在招标文件中。在现行招标文件技术条款“一般规定”中增加“安全文明施工”章节,同时在商务文件“工程量清单”中列细项,并要求投标单位根据自己对招标文件的理解和工程安全文明施工的需要作补充。在此基础上由投标单位在业主确定的一定幅度内确定各子项报价。“安全文明施工”章节可以参照建设部《建筑施工安全检查标准》(JCJ59-99)、《建筑工程安全防护、文明施工措施费用及使用管理规定》(建办[2005]89号)、《浙江省建设工程现场安全文明施工措施费计价管理办法》(建设厅苏建价[2005]349号)、水利部《水利系统文明建设工地考核标准》(1998年4月)、《浙江省建筑施工省级文明工地评审暂行办法》(建设厅苏建建E2003]247号)等法规、办法,结合水利工程的施工特点,针对具体工程情况、施工条件和合同工期编写。相应合同条款中必须明确计量支付条件,并尽可能采用定量考核支付。建议“安全文明施工”章节分基础设施、过程控制、绩效考评3个层次编写。
3.1.1 安全文明施工基础设施项目。
主要指工程开工初期为满足工程安全文明施工需要而实施的临时性工程项目,应该与现行招标文件中“临时设施”章节和相应的工程量清单相区别。例如:职工宿舍、泥结碎石
道路属正常施工所必须的项目,而文化体育娱乐设施、混凝土道路属满足安全文明施工所需要的项目。从另一个角度说:“临时设施”项目是“必须”的,个数多少与工程大小、工期长短关系不大,仅规模不同;而“安全文明施工基础设施项目”是“需要”的,内容应区别工程大小、工期长短和创建文明工地期望达到的水平确定。现行招标文件工程量清单“临时设施”中为保证正常施工和工人生活所必须的生产、生活项目内容仍列为“临时设施”,其它为满足安全生产、文明施工、工人健康生活所需要的内容列为“安全文明施工基础设施项目”,并根据需要补充若干细项。在编写“安全文明施工基础设施项目”时,应特别注意针对现状工程建设中安全文明施工方面的薄弱环节和常见问题提出项目要求。
3.1.2 安全文明施工过程控制项目。
主要指永久工程施工过程中为确保安全文明施工需要而实施的项目,根据拟招标的工程项目性质、规模、内容确定。可以按工程项目的施工过程划分若干阶段性控制要素,也可以按工程项目工序内容划分若干控制范围。如:基坑降排水及安全围护、脚手板搭设及安全网围封、施工通道及临边洞口防护、安全用电及施工照明、成品保护及工作面清理、安全警示、环境保护、食堂卫生等等。招标文件中对安全检查考核的标准、频次、方法要给予明确,要将“安全文明施工过程控制项目”中的相关内容与工序质量控制内容一并查验,明确未经检查验收合格并签署书面意见,不得进人下一道工序施工。要通过规范化管理下决心解决水利工程施工中的粗放管理、平时脏乱差、临时突击清理打扫的陋习。要把安全文明施工的相
关项目和工作内容与计量支付量化挂钩,促使施工单位主动加强管理。
3.1.3 安全文明施工管理及绩效考评项目。
侧重于对施工单位的安全文明施工管理的检查、考核,包括专兼职安技人员配备、安全教育培训、持证上岗、危险源控制、安全自查及安全检查所提问题的落实整改等动态管理内容和上级有关部门对工程项目安全文明施工管理的评价(包括检查、稽查、文明工地评选等)。具体内容能量化的尽可能量化,并与费用挂钩。考评达不到分值要求的扣罚施工单位相关经费,管理成效明显经考评符合相应条件的,给施工单位予以奖励。
3.2 严格过程控制,推行规范化管理。
标准化、规范化管理的前提是标准,但更重要的是通过严格的过程控制确保符合标准,以实现规范化管理的目标。必须明确安全文明施工的检查程序、检查内容,并与经费挂钩。现状项目管理实践中,施工单位在投标文件施工组织设计章节中对文明工地设施所作的承诺经常不能全部兑现。究其原因既有合同不完善的一面,也有监控不力的一面。“安全文明
施工基础设施项目”基本上都是总价项目,实施过程中监理必须对照合同项目严格考核有无保质保量全部完成,否则该项报价应部分或全部不予计量支付。
推行标准化、规范化管理,不仅要看初期投入、环境状况,更要特别注重施工过程中的安全防护、安全文明措施和安全文明行为。施工单位进场以后,必须根据施工图和现场实际
情况对投标文件中的“安全文明施工过程控制项目”进一步细化后报监理批准。监理要制定针对性的检查、考核细则报建设单位批准后实施。在动态检查、考核的基础上对相应子项费
用分期支付,全部完成后结清。不满足合同条件的不予支付。
3.3 推行激励机制,全面提升管理水平。
试行安全文明施工风险基金制度,具体奖惩办法由建设单位和施工单位签订。施工单位的现场项目经理部在取得第一次工程预付款时交纳一定数额的安全文明施工保证金,建设单位从合同备用金中提取相等数额的安全文明施工奖金,(合并组成安全文明施工风险基金由建设处专户存储。40%的风险基金用于施工过程中“安全文明施工管理及绩效考评项目”的检查、考核兑现,20%的风险基金奖励省水利系统文明工地,20%的风险基金奖励省、部级文明工地,工程结束未发生生产安全事故奖励20%的风险基金。
安全文明施工的责任主体是施工单位,建设单位和监理单位主要起监管作用。要通过动态管理和激励机制,推动和促进施工单位增加安全文明施工投入,强化安全文明施工管理,全面提升安全文明施工管理水平。
3.4 建议。
在积极探索标准化、规范化安全文明施工管理的基础上,及时总结、交流,适时制定出台浙江省大中型水利工程建设管理标准化合格现场考核标准,根据标准化合格现场考核标准,经考核合格的工地才能逐级申报文明工地。为了鼓励创建文明工地,建议全省水利系统分省、市两级评选文明工地,原则上每年评选一次。评为文明工地的项目经理三年内可在
投标中获得评标加分。
在省厅的正确领导和工程建设领域参建各方的共同努力下,一定能全面推进标准化、规范化安全文明施工现场管理,打造健康、和谐、安全、文明发展的水利建设新形象。