论文部分内容阅读
为适应供坯对象改为即将新建的棒线厂,由此引起了七五○工程自产品大纲开始的一系列修改。本文论述了棒线厂坯料断面选择问题以及付诸实施中的一点体会。
In order to adapt to the blank object to be about to build a new wire and cable factory, which led to a series of changes from the beginning of the product outline 750 Engineering. This article discusses the selection of billet cross-section of the fab and its implementation.