鲁布革水电站位于云南、贵州两省交界处风光秀丽、姿态万千的黄泥河上,总装机容量60万千瓦。从1984年破土动工到1988年底第1台15万千瓦的水轮发电机组发电仅用4年时间,整个工程由3部份组成:一是首部枢纽,在国内率先使用风化料心墙堆石坝,坝高103.8米,总库容1.1亿立方米,在黄泥河上游库区形成了湖水清幽、峡高壁峭、集雄、奇、险、秀、幽为一体的鲁布革
The Lubuge Hydroelectric Power Station is located on the Huangni River, where the Yunnan and Guizhou provinces are in beautiful scenery and poses with a total installed capacity of 600,000 kilowatts. From the ground breaking in 1984 to the end of 1988, the first 150,000-kilowatt turbine-generator set took only four years to complete. The entire project consists of three parts: First, the first hub, the first in China to use weathered core rockfill dams. With a height of 103.8 meters and a total storage capacity of 110 million cubic meters, the dam has formed in the upper reaches of the Huanghe River a lake with a quiet lake, steep walls, an abundance of chimeras, an odd, dangerous, show, and quiet.