论文部分内容阅读
1964年8月17日,C1abecq钢铁公司新氧气转炉钢厂成功地吹炼出第一炉钢。该厂位于布鲁塞尔南部,以前,它有一座托马斯转炉钢厂,内有6座20吨托马斯转炉,年产原钢60万吨,用来轧制钢板。由于钢的需要量不断增加,Clabecq钢铁公司计划大大增加钢的生产能力。在决定采用氧气吹炼法之后,计划了扩建的第一期工程:即先建造一座氧气转炉钢厂,一座板坯初轧厂,以及一
On August 17, 1964, C1abecq Steel’s new oxygen converter steel mill successfully produced the first furnace steel. The plant, located in southern Brussels, used to be a Thomas converter steel mill with six 20-tonne Thomas converters and an annual output of 600,000 tonnes of raw steel for the rolling of steel. As steel demand continues to grow, Clabecq Steel plans to significantly increase steel production capacity. After deciding to adopt the oxygen blowing method, the first phase of the expansion was planned: first to build an oxygen converter steel mill, a slab bloom mill, and a