我公司2 500 t/d生产线采用单系列5级旋风预热器、Φ5.1 m×30 m管道式分解炉,于2014年12月新上SNCR脱硝系统,NOx排放值控制在400 mg/Nm3以下,氨水使用量在500 kg/h,由于大量的冷风和氨水喷入分解炉,热耗增加约2~3 kgce/tcl,系统受到影响,熟料生产成本增加较多。为了降低能耗,减少氨水使用量,公司采用分级燃烧技术来降低NOx。经过改造调试,运行3个月减排效果良好,在不喷氨水的情况下,NOx排放降低50%~60%,使用少量氨水或有时停用
Our 2 500 t / d production line uses a single series of 5-stage cyclone preheater and a Φ5.1 m × 30 m pipeline calciner. In December 2014, the new SNCR denitrification system was built and the NOx emission was controlled at 400 mg / Nm3 In the following, the amount of ammonia used is 500 kg / h. Since a large amount of cold air and ammonia are sprayed into the calciner, the heat consumption is increased by about 2 to 3 kgce / tcl. The system is affected and the cost of clinker production increases more. To reduce energy consumption and reduce ammonia usage, the company uses staged combustion technology to reduce NOx. After retrofit and commissioning, the emission reduction effect of 3 months of operation is good. In the case of no ammonia injection, the NOx emission is reduced by 50% ~ 60%, the use of a small amount of ammonia water or sometimes deactivation