论文部分内容阅读
根据实际情况分析抽水蓄能电站的投资组成、投资特征和呼蓄电站投资控制难点,提出呼蓄电站建设投资控制方法和措施。
According to the actual situation, the paper analyzes the investment composition, investment characteristics and investment control difficulties of Pumped Storage Power Station, and puts forward the control methods and measures for Huadian Power Station construction investment.