焦作万方电厂配套供热管网二期工程热力管道在龙源路群英河桥南侧穿越群英河,按照《中华人民共和国防洪法》第二十七条规定,建设穿河、穿河堤、邻河的桥梁、码头、道路、渡口、管道、缆线、取水、排水等工程设施,应当符合防洪标准、岸线规划、航运要求及其它要求,不得危害堤防安全,影响河势稳定,妨碍行洪畅通,其工程建设方案应经有关水行政主管部门审查同意,根据《河道管理范围内建设项目防洪评价报告编制导则》及有关规定,穿越河道位于焦作市城区,依据《焦作城区防洪规划》及《焦作市南水北调防洪影响处理工程群英河施工图设计》等相关规划设计成果,结合穿越处河道边界条件,河道演变情况,对热力管道穿越群英河工程建成后洪水位、冲刷、淤积以及对工程上下游其它工程设施影响进行防洪评价综合分析,并对造成影响的情况,提出相应的防治及补救措施,确保河势稳定与行洪安全。
Jiaozuo Wanfang Power Plant heating pipe network supporting the second phase of the thermal power plant in the Longyuan Road south of the bridge across the Qunying River, in accordance with the “People’s Republic of China Law on Flood Prevention,” the provisions of Article 27, the construction of crossing the river embankment, The engineering facilities of bridges, docks, roads, ferries, pipelines, cables, water intake and drainage of the adjacent river shall comply with flood control standards, shoreline planning, shipping requirements and other requirements, shall not endanger the safety of dikes, affect the stability of the river and obstruct the stability of the river According to the Guidelines for the Compilation of Flood Control Evaluation Report for Construction Projects within the Scope of River Management and related regulations, the project of construction should be approved by the relevant water administration department in accordance with the “Jiaozuo Urban Flood Control Planning” And “Jiaozuo City South-to-North Water Diversion Project Qunying River Construction Design” and other related planning and design results, combined with crossing the river boundary conditions, the evolution of the river, the heat pipe through the Qunyinghe flood flood after completion of the project, erosion, siltation and the project Upstream and downstream of the impact of other engineering facilities for flood control evaluation of a comprehensive analysis, and the impact of the situation, the proposed phase Preventive and remedial measures to ensure the stability of river and flood safety.