论文部分内容阅读
随着“两网”改造工作的深入开展,输变电工程成为电力部门的一个重要投资部分,同时国内电力市场得到进一步开放,国外资本的进入,输变电工程建设的竞争也将不断激烈,这就要求电力部门在工程建设服务方面、技术质量方面以及自身成本控制方面有所加强。本文从目前输变电工程建设的实际情况出发,对目前输变电工程造价超支等方面存在的问题进行了分析,同时提出了一些应对措施和建议。
With the in-depth development of the transformation of “Two Networks”, the power transmission and transformation project has become an important investment part of the power sector. At the same time, the domestic electricity market has been further opened up. The entry of foreign capital and the competition of power transmission and transformation projects will also continue Intense, this requires the power sector to be strengthened in terms of engineering construction services, technical quality and cost control. Based on the current situation of power transmission and transformation project construction, this paper analyzes the existing problems of over-expenditure in transmission and transformation project, and puts forward some countermeasures and suggestions.