论文部分内容阅读
目前我国的高速铁路已初具规模,在给人民出行带来快捷、舒适、准点的同时,高速铁路的安全要求也更高,故在高速铁路的建设中,投入了一大批新技术、新设备。高速铁路的供电设备更是较既有线设备有了较大的变化。在全电缆线路、箱式变电站等新设备投入的同时,在检修时无法使用试电笔进行验电,给现在供电作业人员的人身安全带来了隐患。因此,如何保证电力作业人员人身安全成为当前一个重要议题。根据合武客运专线实际情况,探讨客专线全电缆线路停电维修作业人员人身安全,分析寻找避免人身伤害的途径和方法是至关重要的。
At present, the high-speed railway in our country has begun to take shape and brought fast, comfortable and punctual travel to the people. At the same time, the safety requirements of high-speed railway are also higher. Therefore, in the construction of high-speed railway, a large number of new technologies and new equipment . High-speed rail power supply equipment is more than the existing cable equipment has been greatly changed. In the whole cable lines, box-type substations and other new equipment into the same time, overhaul can not use the test pencil for electrical inspection, power supply operators now have a hidden danger. Therefore, how to ensure the personal safety of power workers has become an important issue at present. According to the actual situation of Hefei-Wuhan passenger dedicated line, it is very important to investigate the personal safety of blackout maintenance workers in all cable lines of passenger dedicated line and to find ways and means to avoid personal injury.