摘要:施工项目成本管理是企业在追求企业价值最大化,获取更大经济效益的经营过程,在控制成本和降低成本方面所采取的重要手段。传统的成本管理核算只是被动地记账、算账,其重要任务是对施工过程中发生的各项支出进行归集、分配,很少在成本控制方面作出必要的反映和会计监督,在成本管理方面缺乏有效的成本制度,也无有效的成本分析和成本考核,成本开支的随意性很大。
关键词:施工;项目;成本管理
Abstract: The construction project cost management is in the pursuit of maximizing corporate value, to obtain greater economic benefits of business process, cost control and cost reduction taken by the important means. Traditional cost management accounting just passively account, afterwards, the important task is to occur during the construction expenditures for collection, distribution, rarely make the necessary cost control and accounting oversight reflected in cost management lack of effective cost system, and no effective cost analysis and cost assessment, costs and expenses of arbitrary large.Keywords: Construction; projects; Cost Management
中图分类号:F275.3文献标识码:A文章编号:
施工单位要提高市场竞争力最终要在项目施工中以尽量少的物化消耗和活劳动消耗来降低工程成本,把影响工程成本的各项耗费控制在计划范围内,必须加强成本管理。观念、管理方法决定思路,思路决定出路。在具体操作过程中可以在单位内部或项目经理部实行项目经理部工程承包制,以达到降低工程成本,提高经济效益,增强竞争力的目的。项目经理部工程承包制即指在工程设计图纸下达后,项目部成本核算人员首先根据工程预算做一个成本预测和计划,然后项目部根据工程成本预测计划向主管领导提交项目承包责任书及成本控制目标。本文就施工企业项目成本管理特点和从提高全员经济意识、材料使用和管理、人力资源管理、机械使用和管理四个方面浅谈一下如何在施工单位内部实行项目部工程承包制。
(一)施工项目成本管理的特点1、项目成本管理的对象具有单一性。施工企业的产品与其他企业的产品截然不同,工程项目成本管理的对象是工程项目,它既可以是一个建设项目、一个单项工程,也可以是一个单位工程。虽然成本管理方法可以通用,但具体实施起来却各有不同,不能套用,只能因项目而宜。2、项目成本管理的工作具有一次性。工程项目具有一次性特点,一个工程项目从基础施工、主体封顶到装修竣工,循序渐进设有重复,这要求项目成本管理工作要同步前进,不能反复,特别是周期长、投入耗资大的工程项目,如果疏于成本管理,代价是巨大的。这是项目成本管理区别于其他企业成本管理的重要特征。 3、项目成本管理在控制上具有超前性。由于工程项目一次性特点,要求项目成本管理只能在不再重复的过程中进行,决定了项目成本管理的超前性。为保证工程项目的必盈不亏,成本管理就必须做到事前管理和事中控制,而不能事后算账,项目从承包开始,就必须采取“于前预算、于中核算。边干边算”的成本管理办法,不能“只管干,不管算”。如果在工程项目结束时再进行成本费用核算,必然是“不算不知道,一算吓一跳”。)4、项目成本管理系统具有综合性。在项目成本管理预测、计划、控制、核算、分析和考核这六大环节性中,只有依靠各部门配合协作,才能取得良好的效果。5、项目成本管理范围具有约束性。工程项目成本管理,只是对工程项目的直接成本和间接成本的管理,从实行“制造成本法”后,并非所有收人都属于成本管理范畴,如管理费用、财务费用等就不在此范围内。另外,工程项目成本管理是在施工现场进行的,它与施工过程的质量、工期等各项管理是同步的,成本范围还受到施工场所以及管理阶段的约束,因此,必须从工程管理的实际出发,确定成本核算范围。 (二)如何在施工单位内部实行项目部工程承包制。
1、提高全员经济意识
在项目部工程承包制中项目部要想做好成本管理工作,首先必须明确的一点是成本管理应该是全员管理。成本控制决不单纯是工程核算人员、财务人员的任务,也不仅仅是财务部门和项目部的事,而是全体建设参加者的共同任务。成本控制要做到全员参与,树立全员经济意识。而如何树立全员经济意识正是现在施工单位急需解决的一个问题。
在项目部工程承包制中提高全员经济意识应做到以下几点: ①可以由项目经理首先与上级领导签订责任书,明确自己在工程施工过程中遇到不同情况时所应承担的责任。在明确责任的同时要确定责任成本(责任成本是指按照责任者的可控程度所归集的应由责任者负责的成本)。在责任成本范围内如果出现成本人为超耗视具体情况按百分比扣除项目经理奖金;如果成本损耗低于成本预测计划即工程成本降低了则按百分比一次性奖励项目经理部分奖金。②在项目部内部层层分解责任,层层分解责任成本,层层签订责任书。明确好项目部内各个成员的责任,谁负责、谁负担。提高项目部内成员的责任意识,可将责任书上墙,时刻提醒项目部内成员。③具体考核措施:可以在项目部内部成立一个考核小组在每道工序完成后,根据项目部内成员责任成本完成情况,进行商议考核。在各自责任成本范围内,成本节约了则所节约成本的2%作为奖金奖励给相关人员。如果成本超耗且是人为超耗则按超耗成本的1%扣除奖金。
2、强抓材料管理和使用在施工全過程中,材料费占施工总成本的60%左右,施工单位要想控制施工总成本,在材料管理和使用上应引起高度重视,加强管理,减少施工过程中不必要的经济损耗。现在大部分单位采用的是材料采买权归职能部门所有,这种方式在很大程度上减轻了项目部的施工压力和施工负担,但为了更好的发挥职能部门的作用,使工程在低成本投入的情况下顺利完工,建议在项目部工程承包制中,材料采购部门及现场相关人员应做到以下几点: (1)做好材料采购前的基础工作。工程开工前,项目经理、工长必须反复认真的对工程设计图纸进行熟悉和分析,根据工程测定材料实际数量,提出材料申请计划,申请计划应做到准确无误。在材料采购前,材料采购部门应建立询价小组,小组对市场价格进行调查。材料采购人员所采购材料的价格不得突破询价小组的价格。可以定期召开例会,在例会上由询价小组汇报材料的询价情况,对于钢材、木材、砂石料分别汇报不同厂家的价格和质量,列举出选材使用理由,同时公开厂家的联系方式,以增大监督力度,提高透明度,保证做到“货比三家”优质低价购料。 (2)材料的使用在施工过程中要加强材料量的管理施工现场应:①各分项工程都要控制住材料的使用。物资消耗,特别是钢材、木材、砂石料严格按定额供应,实行限额领料。在材料领取、入库出库、投料、用料、补料、退料和废料回收等环节上尤其引起重视,严格管理。对于材料操作消耗特别大的工序,由项目经理部直接承包。具体施工过程中可以按照不同的施工工序,将整个施工过程划分为几个阶段,在工序开始前由工长、材料员分配大型材料使用数量,工序施工过程中如发现材料数量不够,由材料员报请项目经理领料,并说明材料使用数量不够的原因。每一阶段工程完工后,由材料员清点、汇报材料使用和剩余情况,材料消耗或超耗分析原因并与经济责任制挂钩予以奖惩。②也可在项目经理部实行材料包干使用,节约有奖、超耗则罚的制度。③及时发现和解决材料不节约、出入库不计量,生产中超额用料和废品率高等问题。实行特殊材料以旧换新,领取新料由材料使用人或负责人提交领料原因。材料报废须及时提交报废原因。以上所提到的提交的各种申请及汇报材料无须大篇幅编写,简单说明原因即可,但必须提交,以便有据可循,作为以后奖惩的依据。
除此种材料采买权归职能部门所有的管理机制外,也可尝试使用材料采买权归项目部所有。项目经理部工程承包制中在保证工程进度和工程质量的前提下,由项目经理部自行选择使用某个厂家的材料。运用此种机制如果成本降低,则将所降低成本的50%奖励给项目部。实行此种运行机制可使项目部具有相对独立性,可以自主选择管理方式、竞争机制,增强项目部内相关人员的责任意识;材料供给上也增强了及时性,使得材料供给能够更好的满足工程要求,在一定程度上加快了施工进度。在工程施工成本中,除了构成实体的直接性消耗材料成本外还有另一类周转性材料成本。周转性材料是指在施工中不是一次性消耗的材料,它是随着多次使用而逐渐消耗的材料,并在使用过程中不断补充、多次重复使用。对于周转材料在每项工程中的成本摊销方式,我们可以尝试采用以下公式进行成本核算:摊销量=一次使用量×(1+损耗率)/周转次数一次使用量:根据施工图纸进行计算的供申请备料和编制施工作业计划使用量。周转次数:指新的周转性材料,从第一次使用,到这部分材料不能再提供使用的使用次数。损耗率:指周转性使用材料,在某项工程中,根据使用的频繁程度、工程对象特征、工期长短等情况,制定的该部分周转性使用材料在该工程中应计取的材料摊销的数量。
例:周转性使用材料钢管脚手一次使用量为29.9万元,设周转次数为10次,损耗率为10%(实际损耗率应低于10%),则该批周转性使用材料的摊销量为=29.9×(1+10%)/10=3.29万元。在工程施工中可以分别试行不同的材料使用和管理方式,以便进行对比、探讨,寻求最佳的管理机制。
3、人力资源的管理
成本控制中,人工成本的控制也是很重要的一个方面。现在大多数施工单位急待解决施工现场民工管理问题,施工工地在施工过程中都不同程度的存在民工不服从调配、偷懒或窝工等情况。针对这一现象,在项目经理部工程承包制中,为了减少人力资源消耗加快施工进度,应该做到:在施工开始前,不仅要排施工进度计划,也应该据施工进度计划排出每道工序民工用工计划,根据用工计划算民工费。在开工前与民工负责人商议此份用工计划,做到民工负责人心中有数。项目部根据每道工序民工用工计划事先拟订民工使用成本目标,并提交上级领导审查。施工单位据民工使用成本目标向项目部通告人工费拨款计划。工程完工后,民工费在事先拟订的目标基础上降低了,则将节约资金的1%奖励给项目部相关人员。在工程开工后,要严格控制定员,劳动定额,出勤率,加班加点等问题;及时发现和解决人员安排不合理,派工不恰当,时紧时松,窝工、停工等问题。在工程施工中,应该增加每天早晨由工长派工这个环节。早晨由工长指定上岗民工数,指定的人数应与用工计划基本吻合,一天中视具体情况增加民工上岗。这样就可以在一定程度上避免民工闲滞情况出现,降低人工成本。在施工过程中,应增强民工负责人的责任意识。遇调配民工、追究责任等问题,直接与民工负责人交涉;也可在施工开始前与民工负责人签订责任书及承包书等,明确责任。这样同样可以达到避免生产时紧时松,窝工、停工等问题,降低人工成本的目的。可采用各项施工工序民工承包施工的方法:在保证施工质量、施工进度的前提下,针对不同的施工工序定工期、定质量、定人工量,由民工分段承包施工。这样在一定程度上避免了施工管理中的许多麻烦,减轻了项目经理、工长的工作量,同样达到了降低人工成本的目的。具体的民工费考核标准,先采取以上的管理方式待工程完工后对比几个工地的专人记工数成本和合同成本分析其中的浮动额。根据不同结构形式桥梁的不同施工情况,分析民工费在工程总造价中所占的比率,按工程总造价的百分比对民工费予以支付。除民工管理问题外,项目部内部人员也应该合理配置、加强管理。项目经理部工程承包制中,在项目经理向上级领导提交项目承包责任书的同时可以由项目经理提出项目部人员配置计划,在不影响施工进度满足施工质量的前提下由项目经理自行安排项目部成员构成,特殊岗位必须有专人负责,其他岗位如果条件允许可以实行一人多岗,或不设专人长期留守工地负责。项目部内可引进竞争机制,各岗位负责人定期写工作总结上交项目经理,项目经理根据工作表现,从月底工地人员奖金总额中抽出部分奖金奖励表现较好的人员。项目部可以定期举行一些小的活动,如组织大家去打羽毛球、保龄球等以增进项目部成员之间的感情,锻炼大家的团队精神使大家能够更好的了解彼此,从而在工作中更好的协作、配合,高质量、高效率的完成工作。
4、机械使用和管理施工机械费占施工总成本的20%左右,对于施工机械的使用和管理也是成本管理中的一个重要环节。现在大部分企业实行的是机械调配权归职能部门所有,在这种管理方式下如果实行项目部工程承包制则要求:确定机械手的岗位职责,每天记录所内机械及外租机械使用情况。机械手不应该只是单纯的维修、保养机械,也应该确实的溶入到工地中,了解工程进度。对于重要工序所使用的重要机械,机械手可以在施工工序开始前向项目部提出申请承包机械种类、数量及台班数,待工序完成后如台班数节约则所节约的台班数按台班费兑现,将其中的10%奖励给机械手。在保证工程质量和工程进度的前提下,如果不同规格、型号机械的台班费既定,也可实行机械调配权归项目部所有,由项目部自行选择租赁所内机械或外租机械,如采用此种方式使得机械使用成本降低,则将所降低成本的50%奖励给项目部。以上是从提高全员经济意识、材料使用和管理、人力资源管理、机械使用和管理四个方面浅谈了一下施工单位如何实行施工现场成本管理。除此之外我还想提几个建议:
(1)施工前,做好项目成本预测和计划。 (2)成本控制目标层层分解,并与经济利益挂钩,以强化全員经济意识,达到降 低成本提高经济效益的目的。 (3)定期召开经济活动分析会。主要分析内容为:①现场已完工程量,监理已签字工程量。②人工消耗及费用,未来一周的每日用工计划。③材料消耗、运输费用,周转材料,修旧利废,材料节超情况及原因,未来一周材料需用种类及数量。④机械费用发生额,维修折旧及租赁费用,未来一周机械需用种类及数量。⑤对工段成本节超给予奖惩。⑥对项目部费用控制提出整改措施。
(三)案例分析
以本公司现阶段承建的良熟高层公寓工程为实例,现从人工成本的管理方面做一分析:
在施工开始前,我项目部技术人员提前安排施工进度计划,根据施工进度计划排出每道工序民工用工计划,根据用工计划算民工费。在开工前与民工负责人商议这份用工计划,做到民工负责人心中有数。
在工程开工后,我项目部严格控制定员,劳动定额,出勤率,加班加点等问题;及时发现和解决人员安排不合理,派工不恰当,时紧时松,窝工、停工等问题。在工程施工中,每天晚上都做好每个环节的用工计划,第二天早晨由工长派工的人数与用工计划基本吻合,一天中视具体情况增加或减少民工上岗。这样就可以在一定程度上避免民工闲滞情况出现,降低人工成本。
我项目部内部人员采取合理配置、加强管理。在不影响施工进度满足施工质量的前提下,除特殊岗位必须有专人负责外,其他岗位如果条件允许尽量采用一人多岗。项目部内引进竞争机制,各岗位负责人定期写工作总结上交项目经理,项目经理根据工作表现,从月底工地人员奖金奖励表现较好的人员。
我项目部在以上的人工成本管理下,在保证施工进度和质量的前提下,较大的节约了人工成本费用。由此可以看出人工成本管理在工程项目施工中的重要性。
(四)结论
总之,项目成本管理在施工企业经济管理中占有举足轻重的地位,它是企业经济管理的中心,是企业效益的源泉,是企业生存的基础,是企业发展的动力,强化项目成本管理,是施工企业成功之本。
关键词:施工;项目;成本管理
Abstract: The construction project cost management is in the pursuit of maximizing corporate value, to obtain greater economic benefits of business process, cost control and cost reduction taken by the important means. Traditional cost management accounting just passively account, afterwards, the important task is to occur during the construction expenditures for collection, distribution, rarely make the necessary cost control and accounting oversight reflected in cost management lack of effective cost system, and no effective cost analysis and cost assessment, costs and expenses of arbitrary large.Keywords: Construction; projects; Cost Management
中图分类号:F275.3文献标识码:A文章编号:
施工单位要提高市场竞争力最终要在项目施工中以尽量少的物化消耗和活劳动消耗来降低工程成本,把影响工程成本的各项耗费控制在计划范围内,必须加强成本管理。观念、管理方法决定思路,思路决定出路。在具体操作过程中可以在单位内部或项目经理部实行项目经理部工程承包制,以达到降低工程成本,提高经济效益,增强竞争力的目的。项目经理部工程承包制即指在工程设计图纸下达后,项目部成本核算人员首先根据工程预算做一个成本预测和计划,然后项目部根据工程成本预测计划向主管领导提交项目承包责任书及成本控制目标。本文就施工企业项目成本管理特点和从提高全员经济意识、材料使用和管理、人力资源管理、机械使用和管理四个方面浅谈一下如何在施工单位内部实行项目部工程承包制。
(一)施工项目成本管理的特点1、项目成本管理的对象具有单一性。施工企业的产品与其他企业的产品截然不同,工程项目成本管理的对象是工程项目,它既可以是一个建设项目、一个单项工程,也可以是一个单位工程。虽然成本管理方法可以通用,但具体实施起来却各有不同,不能套用,只能因项目而宜。2、项目成本管理的工作具有一次性。工程项目具有一次性特点,一个工程项目从基础施工、主体封顶到装修竣工,循序渐进设有重复,这要求项目成本管理工作要同步前进,不能反复,特别是周期长、投入耗资大的工程项目,如果疏于成本管理,代价是巨大的。这是项目成本管理区别于其他企业成本管理的重要特征。 3、项目成本管理在控制上具有超前性。由于工程项目一次性特点,要求项目成本管理只能在不再重复的过程中进行,决定了项目成本管理的超前性。为保证工程项目的必盈不亏,成本管理就必须做到事前管理和事中控制,而不能事后算账,项目从承包开始,就必须采取“于前预算、于中核算。边干边算”的成本管理办法,不能“只管干,不管算”。如果在工程项目结束时再进行成本费用核算,必然是“不算不知道,一算吓一跳”。)4、项目成本管理系统具有综合性。在项目成本管理预测、计划、控制、核算、分析和考核这六大环节性中,只有依靠各部门配合协作,才能取得良好的效果。5、项目成本管理范围具有约束性。工程项目成本管理,只是对工程项目的直接成本和间接成本的管理,从实行“制造成本法”后,并非所有收人都属于成本管理范畴,如管理费用、财务费用等就不在此范围内。另外,工程项目成本管理是在施工现场进行的,它与施工过程的质量、工期等各项管理是同步的,成本范围还受到施工场所以及管理阶段的约束,因此,必须从工程管理的实际出发,确定成本核算范围。 (二)如何在施工单位内部实行项目部工程承包制。
1、提高全员经济意识
在项目部工程承包制中项目部要想做好成本管理工作,首先必须明确的一点是成本管理应该是全员管理。成本控制决不单纯是工程核算人员、财务人员的任务,也不仅仅是财务部门和项目部的事,而是全体建设参加者的共同任务。成本控制要做到全员参与,树立全员经济意识。而如何树立全员经济意识正是现在施工单位急需解决的一个问题。
在项目部工程承包制中提高全员经济意识应做到以下几点: ①可以由项目经理首先与上级领导签订责任书,明确自己在工程施工过程中遇到不同情况时所应承担的责任。在明确责任的同时要确定责任成本(责任成本是指按照责任者的可控程度所归集的应由责任者负责的成本)。在责任成本范围内如果出现成本人为超耗视具体情况按百分比扣除项目经理奖金;如果成本损耗低于成本预测计划即工程成本降低了则按百分比一次性奖励项目经理部分奖金。②在项目部内部层层分解责任,层层分解责任成本,层层签订责任书。明确好项目部内各个成员的责任,谁负责、谁负担。提高项目部内成员的责任意识,可将责任书上墙,时刻提醒项目部内成员。③具体考核措施:可以在项目部内部成立一个考核小组在每道工序完成后,根据项目部内成员责任成本完成情况,进行商议考核。在各自责任成本范围内,成本节约了则所节约成本的2%作为奖金奖励给相关人员。如果成本超耗且是人为超耗则按超耗成本的1%扣除奖金。
2、强抓材料管理和使用在施工全過程中,材料费占施工总成本的60%左右,施工单位要想控制施工总成本,在材料管理和使用上应引起高度重视,加强管理,减少施工过程中不必要的经济损耗。现在大部分单位采用的是材料采买权归职能部门所有,这种方式在很大程度上减轻了项目部的施工压力和施工负担,但为了更好的发挥职能部门的作用,使工程在低成本投入的情况下顺利完工,建议在项目部工程承包制中,材料采购部门及现场相关人员应做到以下几点: (1)做好材料采购前的基础工作。工程开工前,项目经理、工长必须反复认真的对工程设计图纸进行熟悉和分析,根据工程测定材料实际数量,提出材料申请计划,申请计划应做到准确无误。在材料采购前,材料采购部门应建立询价小组,小组对市场价格进行调查。材料采购人员所采购材料的价格不得突破询价小组的价格。可以定期召开例会,在例会上由询价小组汇报材料的询价情况,对于钢材、木材、砂石料分别汇报不同厂家的价格和质量,列举出选材使用理由,同时公开厂家的联系方式,以增大监督力度,提高透明度,保证做到“货比三家”优质低价购料。 (2)材料的使用在施工过程中要加强材料量的管理施工现场应:①各分项工程都要控制住材料的使用。物资消耗,特别是钢材、木材、砂石料严格按定额供应,实行限额领料。在材料领取、入库出库、投料、用料、补料、退料和废料回收等环节上尤其引起重视,严格管理。对于材料操作消耗特别大的工序,由项目经理部直接承包。具体施工过程中可以按照不同的施工工序,将整个施工过程划分为几个阶段,在工序开始前由工长、材料员分配大型材料使用数量,工序施工过程中如发现材料数量不够,由材料员报请项目经理领料,并说明材料使用数量不够的原因。每一阶段工程完工后,由材料员清点、汇报材料使用和剩余情况,材料消耗或超耗分析原因并与经济责任制挂钩予以奖惩。②也可在项目经理部实行材料包干使用,节约有奖、超耗则罚的制度。③及时发现和解决材料不节约、出入库不计量,生产中超额用料和废品率高等问题。实行特殊材料以旧换新,领取新料由材料使用人或负责人提交领料原因。材料报废须及时提交报废原因。以上所提到的提交的各种申请及汇报材料无须大篇幅编写,简单说明原因即可,但必须提交,以便有据可循,作为以后奖惩的依据。
除此种材料采买权归职能部门所有的管理机制外,也可尝试使用材料采买权归项目部所有。项目经理部工程承包制中在保证工程进度和工程质量的前提下,由项目经理部自行选择使用某个厂家的材料。运用此种机制如果成本降低,则将所降低成本的50%奖励给项目部。实行此种运行机制可使项目部具有相对独立性,可以自主选择管理方式、竞争机制,增强项目部内相关人员的责任意识;材料供给上也增强了及时性,使得材料供给能够更好的满足工程要求,在一定程度上加快了施工进度。在工程施工成本中,除了构成实体的直接性消耗材料成本外还有另一类周转性材料成本。周转性材料是指在施工中不是一次性消耗的材料,它是随着多次使用而逐渐消耗的材料,并在使用过程中不断补充、多次重复使用。对于周转材料在每项工程中的成本摊销方式,我们可以尝试采用以下公式进行成本核算:摊销量=一次使用量×(1+损耗率)/周转次数一次使用量:根据施工图纸进行计算的供申请备料和编制施工作业计划使用量。周转次数:指新的周转性材料,从第一次使用,到这部分材料不能再提供使用的使用次数。损耗率:指周转性使用材料,在某项工程中,根据使用的频繁程度、工程对象特征、工期长短等情况,制定的该部分周转性使用材料在该工程中应计取的材料摊销的数量。
例:周转性使用材料钢管脚手一次使用量为29.9万元,设周转次数为10次,损耗率为10%(实际损耗率应低于10%),则该批周转性使用材料的摊销量为=29.9×(1+10%)/10=3.29万元。在工程施工中可以分别试行不同的材料使用和管理方式,以便进行对比、探讨,寻求最佳的管理机制。
3、人力资源的管理
成本控制中,人工成本的控制也是很重要的一个方面。现在大多数施工单位急待解决施工现场民工管理问题,施工工地在施工过程中都不同程度的存在民工不服从调配、偷懒或窝工等情况。针对这一现象,在项目经理部工程承包制中,为了减少人力资源消耗加快施工进度,应该做到:在施工开始前,不仅要排施工进度计划,也应该据施工进度计划排出每道工序民工用工计划,根据用工计划算民工费。在开工前与民工负责人商议此份用工计划,做到民工负责人心中有数。项目部根据每道工序民工用工计划事先拟订民工使用成本目标,并提交上级领导审查。施工单位据民工使用成本目标向项目部通告人工费拨款计划。工程完工后,民工费在事先拟订的目标基础上降低了,则将节约资金的1%奖励给项目部相关人员。在工程开工后,要严格控制定员,劳动定额,出勤率,加班加点等问题;及时发现和解决人员安排不合理,派工不恰当,时紧时松,窝工、停工等问题。在工程施工中,应该增加每天早晨由工长派工这个环节。早晨由工长指定上岗民工数,指定的人数应与用工计划基本吻合,一天中视具体情况增加民工上岗。这样就可以在一定程度上避免民工闲滞情况出现,降低人工成本。在施工过程中,应增强民工负责人的责任意识。遇调配民工、追究责任等问题,直接与民工负责人交涉;也可在施工开始前与民工负责人签订责任书及承包书等,明确责任。这样同样可以达到避免生产时紧时松,窝工、停工等问题,降低人工成本的目的。可采用各项施工工序民工承包施工的方法:在保证施工质量、施工进度的前提下,针对不同的施工工序定工期、定质量、定人工量,由民工分段承包施工。这样在一定程度上避免了施工管理中的许多麻烦,减轻了项目经理、工长的工作量,同样达到了降低人工成本的目的。具体的民工费考核标准,先采取以上的管理方式待工程完工后对比几个工地的专人记工数成本和合同成本分析其中的浮动额。根据不同结构形式桥梁的不同施工情况,分析民工费在工程总造价中所占的比率,按工程总造价的百分比对民工费予以支付。除民工管理问题外,项目部内部人员也应该合理配置、加强管理。项目经理部工程承包制中,在项目经理向上级领导提交项目承包责任书的同时可以由项目经理提出项目部人员配置计划,在不影响施工进度满足施工质量的前提下由项目经理自行安排项目部成员构成,特殊岗位必须有专人负责,其他岗位如果条件允许可以实行一人多岗,或不设专人长期留守工地负责。项目部内可引进竞争机制,各岗位负责人定期写工作总结上交项目经理,项目经理根据工作表现,从月底工地人员奖金总额中抽出部分奖金奖励表现较好的人员。项目部可以定期举行一些小的活动,如组织大家去打羽毛球、保龄球等以增进项目部成员之间的感情,锻炼大家的团队精神使大家能够更好的了解彼此,从而在工作中更好的协作、配合,高质量、高效率的完成工作。
4、机械使用和管理施工机械费占施工总成本的20%左右,对于施工机械的使用和管理也是成本管理中的一个重要环节。现在大部分企业实行的是机械调配权归职能部门所有,在这种管理方式下如果实行项目部工程承包制则要求:确定机械手的岗位职责,每天记录所内机械及外租机械使用情况。机械手不应该只是单纯的维修、保养机械,也应该确实的溶入到工地中,了解工程进度。对于重要工序所使用的重要机械,机械手可以在施工工序开始前向项目部提出申请承包机械种类、数量及台班数,待工序完成后如台班数节约则所节约的台班数按台班费兑现,将其中的10%奖励给机械手。在保证工程质量和工程进度的前提下,如果不同规格、型号机械的台班费既定,也可实行机械调配权归项目部所有,由项目部自行选择租赁所内机械或外租机械,如采用此种方式使得机械使用成本降低,则将所降低成本的50%奖励给项目部。以上是从提高全员经济意识、材料使用和管理、人力资源管理、机械使用和管理四个方面浅谈了一下施工单位如何实行施工现场成本管理。除此之外我还想提几个建议:
(1)施工前,做好项目成本预测和计划。 (2)成本控制目标层层分解,并与经济利益挂钩,以强化全員经济意识,达到降 低成本提高经济效益的目的。 (3)定期召开经济活动分析会。主要分析内容为:①现场已完工程量,监理已签字工程量。②人工消耗及费用,未来一周的每日用工计划。③材料消耗、运输费用,周转材料,修旧利废,材料节超情况及原因,未来一周材料需用种类及数量。④机械费用发生额,维修折旧及租赁费用,未来一周机械需用种类及数量。⑤对工段成本节超给予奖惩。⑥对项目部费用控制提出整改措施。
(三)案例分析
以本公司现阶段承建的良熟高层公寓工程为实例,现从人工成本的管理方面做一分析:
在施工开始前,我项目部技术人员提前安排施工进度计划,根据施工进度计划排出每道工序民工用工计划,根据用工计划算民工费。在开工前与民工负责人商议这份用工计划,做到民工负责人心中有数。
在工程开工后,我项目部严格控制定员,劳动定额,出勤率,加班加点等问题;及时发现和解决人员安排不合理,派工不恰当,时紧时松,窝工、停工等问题。在工程施工中,每天晚上都做好每个环节的用工计划,第二天早晨由工长派工的人数与用工计划基本吻合,一天中视具体情况增加或减少民工上岗。这样就可以在一定程度上避免民工闲滞情况出现,降低人工成本。
我项目部内部人员采取合理配置、加强管理。在不影响施工进度满足施工质量的前提下,除特殊岗位必须有专人负责外,其他岗位如果条件允许尽量采用一人多岗。项目部内引进竞争机制,各岗位负责人定期写工作总结上交项目经理,项目经理根据工作表现,从月底工地人员奖金奖励表现较好的人员。
我项目部在以上的人工成本管理下,在保证施工进度和质量的前提下,较大的节约了人工成本费用。由此可以看出人工成本管理在工程项目施工中的重要性。
(四)结论
总之,项目成本管理在施工企业经济管理中占有举足轻重的地位,它是企业经济管理的中心,是企业效益的源泉,是企业生存的基础,是企业发展的动力,强化项目成本管理,是施工企业成功之本。