为了优化电网结构、解决武汉市夏季高温时段电网局部卡口问题,武汉供电公司自2009年9月起启动了17项迎峰度夏重点工程,目前已投产12项。预计到今年6月20日前有16项工程可投产送电。然而,110千伏鲁巷步行街变电站工程却因施工频频受阻,至今无法顺利兴建。本是一项利国利民的好事,为何难以施行?
In order to optimize the power grid structure and solve the local bayonet problem of the grid in Wuhan during the high temperature in summer, Wuhan Power Supply Company started 17 key projects of summer peak summer since September 2009 and has put into operation 12 items. It is estimated that 16 projects can be put into production by June 20 this year. However, the project of 110 kV Luxiang Pedestrian Street Substation was frequently blocked due to construction and so far no smooth construction was possible. This is a good thing for the benefit of the country, why it is difficult to implement?