论文部分内容阅读
综合楼工程基础原设计为预应力钢筋砼管桩,改用CM复合地基后,大大降低了施工难度,并节约了大量投资。
The original design of the complex building project is prestressed concrete pipe piles, using CM composite foundation, greatly reducing the construction difficulty and saving a lot of investment.