自建站以来,八盘峡电站汛期发电机组技术供水系统一直是影响八盘峡水电站机组安全运行的主要因素,为提高汛期机组技术供水的可靠性,使其在汛期不受泥沙等杂物的影响,提高机组运行安全可靠性,我们对四川大学高新技术研究中心设计的电站闭式循环水系统进行了认真考察和评估,根据我厂实际情况,认为这套系统适合我站情况,有必要实施及对现有技术供水系统进行改造。
Since the establishment of the station, the technology of the water supply system for the generating units during the flood season in the Bamei Gorge hydropower station has been the main factor that affects the safe operation of the Bupingxia hydropower station. In order to improve the reliability of the technical water supply for the units in flood season, Impact and improve the safe and reliable operation of the unit, we have carried out a careful inspection and assessment of the closed-circuit water system of power station designed by Sichuan High and New Technology Research Center. According to the actual situation of our plant, we think this system is suitable for the situation of our station and it is necessary to implement it And to revamp the existing water supply system.