论文部分内容阅读
建设工程交易过程一般可分为交易合同签订前和签订后两个阶段,相应地,建设工程交易机制主要包括工程招标机制和合同激励机制,鉴于不同子项机制之间存在内在联系,有必要从整体角度对建设工程交易机制进行系统化设计。以交易费用为分析工具和纽带,基于系统视角,将建设工程交易过程中的招标机制和激励机制纳入同一研究框架,构建了建设工程交易机制设计框架模型,并探讨了有待解决的难点问题,为丰富和发展建设工程交易理论和交易机制设计方法提供参考。
Generally, the transaction process of construction projects can be divided into two stages before and after the signing of the transaction contracts. Correspondingly, the transaction mechanism of construction projects mainly includes the bid invitation mechanism and contract incentive mechanism. In view of the inherent relationship between the different sub-mechanisms, The overall perspective of the construction project trading mechanism for systematic design. Taking the transaction cost as the analysis tool and the link, the bidding mechanism and the incentive mechanism in the construction project transaction process are integrated into the same research framework based on the system perspective. The framework of the construction project transaction mechanism design framework is constructed and the difficult problems to be solved are discussed Enrich and develop the construction engineering trading theory and trading mechanism design method.