论文部分内容阅读
在建中的马山埠闸枢纽工程,由安徽水利开发股份有限公司承担节制闸、船闸及老河堵坝的施工任务,其中节制闸、船闸混凝土总量3.4万m3,自2001年11月30日节制闸层开仓浇筑第一方混凝土到2002年6月底止,单月混凝土浇筑最高强度达7000m3,单日混凝土浇筑最高强度达600m3,已完成29200m3混凝土浇筑任务,完成产值2227万元。共计436个单元工程,合格率达100%,优良率达91.25%,工程质量达到设计要求。
The Mashanbu port hub project under construction, Anhui Water Conservancy Development Co., Ltd. undertakes the construction tasks of control gates, ship locks and Laohe dam, of which the control gates and shiplocks total 34,000 m3 of concrete since November 30, 2001 Day control gate layer opening pouring first concrete until the end of June 2002, the highest single month concrete pouring strength of 7000m3, the highest single-day concrete pouring strength of 600m3, 29200m3 concrete pouring tasks have been completed, the output value of 22.27 million yuan. A total of 436 unit projects, the pass rate of 100%, good rate of 91.25%, the quality of the project to meet the design requirements.