论文部分内容阅读
自 1997年 4月 1日铁路第 1次提速至 2 0 0 0年底 ,北京铁路分局已配属各型快速客车 2 39辆 ,运用于京沪、京广等提速干线上。其转向架形式主要有 2 0 9HS型、CW— 2型以及 2 0 6 KP型 3种 ,均配有抗侧滚扭杆装置。在进行快速客车 A2、A3级段修时发现 ,抗侧滚扭杆装置暴露出的?
Since April 1, 1997, the first speed-up of the railway to the end of 2000, the Beijing Railway Branch has assigned 299 various types of express buses to speed-up major lines such as Beijing, Shanghai and Beijing-Guangzhou. The main bogie type 209HS, CW-2 and 206 KP type, are equipped with anti-roll bar device. In the fast bus A2, A3-level repair found that anti-rolling torsion bar device exposed?